Laserfiche WebLink
The total cast includes contractor payments, professional staff char es Ci Staff char es <br />g ( ~Y g <br />for D, E and F and Lane County Staff working on Maxwell Road , reconstruction video <br />. )P <br />documentation costs, geotechnical exploration, field testing, City Administration fee short <br />term financing charges, and legal fees. <br />A portion of the total casts includes $b14,9ob.$3 of street re air casts which under the <br />P <br />~ntergovernment agreement, will be paid by Lane County. These costs have not been <br />included within the assessment distribution against property owners. Additionall some <br />. Y~ <br />service line work for properties prev~ausly assessed for services ~s been aid for b the Ci <br />. g P Y ty <br />~$11,SSd.90}. The remainder of the costs were divided into lateral and service line onions <br />P <br />of the assessment and spread among all properties or artlons of ro ernes in the LID <br />P PP <br />which have not previously been assessed. <br />All developed properties with the boundaries of the Local Im rovement District that have <br />P <br />not previously been assessed for the sewers will be assessed. Vacant ro ernes outside the <br />P P <br />Crty will nat be assessed but were included m the unit cost calculations. The Ci will ca <br />. ~ t3' ~Y <br />these casts in ant~c~pat~on of future collections through the eight-inch a uivalent rocess. <br />. q P ) <br />Vacant property annexed and w2th~n the C1ty l~nuts, or antici aced to be within the Ci b <br />• P tY Y <br />March will be assessed. The determrnatlon of vacant pro ernes has resulted in some <br />. P <br />controversy which ~s addressed ~n a later section. <br />B. UNIT CASTS AND ESTIMATES: <br />The proposed assessment costs and billings were calculated usin the followin fi res: <br />g g ~ <br />Total lateral cost: <br />Total lateral area: <br />Total Service line cost: <br />Total connection points; <br />Unit costs are: <br />Sanitary sewer lateral: <br />for area w/in I bo' <br />$3,122,592.95 <br />14,4?1,9b5 square feet <br />$ 909,23?.ss <br />1,120 <br />$ o.21s?b <br />Sanitary sewer service: <br />for each connection point <br />Local SDC <br />far total lat area <br />$ 811.82 <br />$ 0.025 <br />Regional SDC (MWMC) $ 222.00 <br />for each single family dwelling <br />-Z- <br />