Laserfiche WebLink
13. Goodpasture Lakes Loop Road (Eugene) <br />improvement: Construct to urban standards with 3 to 5 lanes and bicy- <br />cle lanes. Traffic signal controls need to be evaluated for the <br />western intersection with Goodpasture Island Road . <br />i4, Kinsrow, Centennial Boulevard to the east Eugene} <br />Improvement: Upgrade to a two or three lane urban facility with curbs, <br />sidewalks, and bicycle provisions completed . <br />i5. Leo Harris Loop Road, Centennial Boulevard at Gate 1 to Gate 3 or 4. <br />Lane County} <br />Irnpravement: Construct a variable two-to-four lane roadway to urban <br />standards with a sidewalk on the north side and bicycle lanes. The <br />facility will be located along the south edge of the Rutzen Stadium <br />parking lot. <br />16, Old Coburg Road, Game Farm Road to Chad Drive, Eugene} <br />improvement: Upgrade to a two-or-three lane urban street with curbs, <br />sidewalks, and bicycle provisions. <br />11. East~West Collector north of Ayres Road between Gilham Road and County <br />Farm Lvop, Eugene} <br />Improvement: Construct new east-west collector in this location. <br />18, East~West Collector Street, South of Gilham School Eugene} <br />Improvement: Propose new collector street south of Gilham School from <br />Gilham Road to County Farm Road. During the street design process, <br />staff shall work with the Cal Young Neighborhood Asvciation to <br />address safety, speed, school proximity, and park proximity issues; <br />and to consider design alternatives that would restrict a portion <br />of the street to transit use only. <br />i9. North~South Collector Street north of Ayres Road between Gilham Road and <br />Delta Highway. Eugene} <br />Improvement: Construct new north-south collector street in the de- <br />scri bed area. Construct wi th ~s i dewal ks and provisions for bi cy- <br />cles. <br />-3- <br />