Laserfiche WebLink
i9s'69 <br />FINI]Il~GS AND RECD ATIDNS <br />SLJBTEGT: PAVING ON EAST ONE-HAIL OF WOODSIDE DRIVE FROM CAL <br />YOUNG ROAD TO 300-FEET SOUTH (CONTRACT #91-26) <br />BACK.GRDUND <br />This project was initiated by a petition received from a property owner that will bear 64.9 <br />percent of the assessable improvement costs. <br />Based on the petition, the City Engineer initiated the project, as provided for in the Eugene <br />Code 7.160~8~ on January 10,1991. The property owners were notified of the pending local <br />improvement district hearing 14 days prior to the hearing. The local improvement district <br />was authorized by the Council on August 5, 1991. The low bid was submitted by Eugene <br />Sand & Dravel, Inc., for an amount of $25,818.15. <br />Dne property owner, Mr. D. Hill, elected to construct approximately 90 percent of the <br />sidewalk abutting his property at his awn expense. <br />PROJECT <br />The project includes completing a half width street of paving, for approximately 304-feet, <br />curbs and gutters, storm drainage improvements, sidewalks and same minor sanitary sewer <br />improvements. <br />AssESS~s <br />Under City of Eugene assessment policy, 78.3 percent of the improvement casts will be <br />assessed to the abutting property owners, with a balance born by the City. The costs to be <br />assessed are shown below: <br />Paving <br />Sidewalk <br />Driveway <br />$ 77.69/front foot <br />$ 12.68/front foot <br />$ 3.58/square foot <br />Costs listed below are the Engineer's estimate and preliminary casts quoted to property <br />owners at the local improvement hearing fallowing bid opening. <br />Paving $ 83.01/front foot <br />Sidewalk $ 15.79/front foot <br />Driveway $ 3.92/square foot <br />RECD ATIDN <br />The bnal costs are lower than preliminary costs quoted at the local improvement hearing <br />