Laserfiche WebLink
Medium Range Phase} . <br />- upgrade to athree-lane urban facility with sidewalks and ,bike paths <br />Cost: $450,0x0 <br />Distance:.3 mi. <br />Justification: U, ED, A, S, C <br />Jurisdiction: Springfield, Lane County <br />8. Baldy View lane: Long Range Phase} <br />upgrade to urban standards with sidewalks and bike paths, unless determined <br />~~~ unnecessary <br />Cost: $338,000 <br />Distance:.3 mi. <br />Justifica ion: U, A, S <br />Jurisdiction: Springfield <br />9. Deadmond Ferry Road between Game Farm Road East and the Mckenzie River: Long <br />Range Phase} <br />- upgrade to urban standards with sidewalks and bike paths, unless determined <br />unnecessary <br />Cost: 5934,000 <br />Distance:.? mi. <br />Justification: U, A, S <br />Jurisdiction: Springfield <br />~ 0, North-South Collector Road for MDR Site: Medium Range Phase} <br />• construct a north•south collectorraad thatwil! servethe MDR site, including sidewalks <br />and bike paths unless determined unnecessary <br />Cosa: $394,000 <br />Distance:.3 mi. <br />Justification: A, S <br />Jurisdiction: Springfield <br />~ ~ . Pioneer Parkway between Harlow Road and Beltli.ne Road: Long Range Phase} <br />extend Pioneer Parkway north to Belt Line Road or to Game Farm Road South•-2 or 4 <br />lanes with landscaped median, including sidewalks and bike paths unless determined <br />unnecessary <br />Cost: $2,205,000 <br />Distance: .5 mi. <br />Justification: A, ED, S, T <br />Jurisdiction: Springfield, CDDT <br />~ 2. Belt Line Road east of Game Farm Road South; tLong Range Phase} <br />- extend Belt Line Road eastward into the MDR site--3 lanes with bike lanes and <br />sidewalks <br />Cost: $439,000 <br />Distance: .3 mi, <br />Justification: A, S <br />Jurisdiction: Springfield <br />~XH1B~T <br />.~flF <br />~~u- <br />