My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 19887
COE
>
City of Eugene
>
Ordinances
>
1990s No. 19660-20183
>
Ordinance No. 19887
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:47:28 PM
Creation date
11/18/2008 2:13:36 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
19887
Document_Title
An ordinance amending the Eugene-Springfield Metropolitan Area Transportation Plan (Transplan).
Adopted_Date
11/9/1992
Approved Date
11/9/1992
CMO_Effective_Date
12/10/1992
Signer
Jeffrey R. Miller
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19~s~~: <br />.EXHIBIT A <br />NOTE: This document represents findings based an the recommendations of the Springfield Planning <br />Commission. References to staff recommendations and Plan Advisory Committee recommendations <br />have been deleted. References to specific Planning Commission recommended changes to the Draft <br />Gateway Refinement Plan will be deleted upon final adoption of ordinances incorporating these <br />findings. <br />FINDINGS <br />-DEMONSTRATING CQNSISTENCY QF AMENDMENTS TD THE TRANSPLAN 1NITH <br />THE EUGENE•SPRINGFIELD METRQPQLITANAREA GENERAL PLAN <br />AND APPLICABLE STATE-I~VIDE PLANNING GOALS, ADMINISTRATIVE <br />RULES, AND STATE STATUTES <br />TransPlan is a functional refinement plan of the Eugene-Springfield Metropolitan Area General Plan <br />Metro Plant'. Section 8.030 of the Spring#ield Development Code ~SDCy specifies criteria that must <br />be met by the Planning Commission and City Council in reaching a decision tv amend a refinement <br />plan, These criteria have been adopted consistent with Element IV--Plan Review, Amendment, and <br />Refinement--of the Metro Plan, In accordance with SDC 8.030, findings must be adopted that <br />demonstrate compliance of the proposed amendments to TransPlan with {1) the Metro Plan, ~~~ <br />applicable state statutes, and (3t' applicable State-wide Planning Goals and Administrative Rules. <br />Criterion ~ : Demonstrated conformance with the Metro Plan, <br />The TransPlan amendments must be consistent with the Metro Plan and its adopted functional <br />refinement plans. <br />Findings; <br />~) Attachment A demonstrates compliance of the Gateway Refinement Plan with the <br />Metro Plan and with adopted TransPlan text. <br />2) Gateway Refinement Plan Transportation Policy ~ 5.0 requires TransPlan amendment <br />proposals as needed to include the Refinement Plan's Transportation Project List. <br />3 f The TransPlan amendments {as described in the attached description and map) <br />implement Gateway Refinement Plan policy regarding the Project List SAS <br />RECOMMENDED IN THE SPRINGFIELD PLANNING COMMISSION CHANGESy, and are <br />therefore consistent with the Refinement Plan, <br />4~ Since the Refinement Plan is consistent with the Metro Plan and TransPlan text, and <br />the TransPlan amendments are consistent with the Refinement Plan, the TransPlan <br />amendments are consistent with the Metro Plan. <br />5) The TransPlan amendments were reviewed by the Transportation Planning Committee <br />~TPC1, a committee composed of interjurisdictional staff, in accordance with the <br />adopted TransPlan amendment process. The Spring#ield and Evgene planning <br />commissions concurred with the TPC recommended TransPlan amendment proposals, <br />which are attached. <br />6~ The projects being added to the Street and "Highway Project Listf" and to the "Bicycle <br />Route Descriptions," all meet one or more of the project justifications described in <br />~~~lslr <br />PAGE ~ G~ ~, <br />
The URL can be used to link to this page
Your browser does not support the video tag.