Laserfiche WebLink
FIl~DINGS AND REC4 ATIDNS <br />SUBJECT- PAVING, SIDEWALKS AND STORM SEWERS ON BOGA~r LANE <br />AND BAILEY LANE FROM WILLAI~NZIE ROAD TO LUELLA <br />STREET (CONTRACT 92-20) <br />BACKCrRDUND <br />The Local Improvement District (LID) for this project was formed by Council Resolution <br />#4333 on June 22, 1992. The project construction has been completed, and all contract <br />payments have been made. The project casts have been assimilated and distributed in <br />accordance with Chapter 7 requirements. Final assessment notices have been prepared and <br />sent to property owners ten ~lU} days prior to the hearing. <br />PROJECT <br />The project included 3~-foot wide paving, with curbs and gutters, a major storm sewer <br />system to serve a larger geographic area, five-foot-wide sidewalks an each side of the street, <br />street lights, and an overlay from Luella.Street to Coburg Raad. <br />ASSF..S.SMENT <br />Under City of Eugene assessment policy, 43.87 percent of the total project cost will be <br />distributed to the abutting property owners. Below are bnal unit assessable costs. <br />20-foot paving $ 44.77/front foot <br />36-foot paving $ 55.11/front foot <br />Driveway $ 2.82/square foot <br />Sidewalk $ 2.73/square foot <br />Sanitary sewer $ 1,119.81/each <br />Costs -listed below are based on the Engineer's estimate and preliminary costs quoted to <br />property owners at the Local Improvement District hearing following bid opening: <br />20-foot paving $ 41.57/front foot <br />36-foot paving $ 72.32Jfront foot <br />Driveway $ 2.89/square foot <br />Sidewalk $ 2.39/square foot <br />FINDINGS AND RECONMENDATICNS - ~ <br />