My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 19932
COE
>
City of Eugene
>
Ordinances
>
1990s No. 19660-20183
>
Ordinance No. 19932
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:47:45 PM
Creation date
11/20/2008 12:02:16 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
19932
Document_Title
Levying assessments for paving, sidewalks & storm drains on Marshall Ave. from 250-ft. east of Hughes St. to Echo Hollow Rd. and on Taney St. from Marshall Avenue to 250-ft. south; and declaring an emergency. (Contract 92-27)
Adopted_Date
9/27/1993
Approved Date
9/27/1993
CMO_Effective_Date
9/27/1993
Signer
Ruth F. Bascom
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HEARING MEMO -MARSHALL AVENUE <br />August 27, ~ 993 <br />Page 2 <br />effect on the cyst per front foot. The cost distribution is in accordance with City Code <br />7.175~Z}fib}1.b.~1}and ~~}. <br />Costs listed below are based on the engineer's estimate and preliminary costs quoted to <br />property owners at the Local Imprvvernent District hearing following bid opening: <br />2~-foot paving $ 44.921frant foot <br />2H-foot paving $ 58.241front foot <br />36-foot paving $ 54.461front foot <br />7" thick driveway apron $ 15.381frant foot <br />5" thick driveway apron ~ 12.971front foot <br />5-foot sidewalk ~ 12. ~ 4lfront foot <br />Asphalt driveway adjustment $ 1.291square foot <br />Concrete driveway adjustment ~ 2.591square foot <br />The final assessment cost for 28-foot paving is slightly higher than what was quoted at <br />the LID hearing, since the cost of driveway adjustment beyond the apron area are now <br />included in the f rout foot paving cost. <br />RECOMMENDATION <br />The final improvement costs are comparable tv those quoted at the local improvement <br />hearing and are comparable to typical projects of this:size. Staff recommends approval <br />of the assessment distribution. <br />
The URL can be used to link to this page
Your browser does not support the video tag.