Laserfiche WebLink
HEARING MEMD -WEST AND AVENUE <br />November ~ 7, 1993 <br />Page 2 <br />RECOMMENDATION <br />Based on a request of the owner, the costs are being distributed on a percentage basis, <br />to the 1 ~ lots within the subdivision and the Timberline costs were established by <br />standard assessment procedures. The final unit assessable casts are broken out as <br />sanitary and storm sewers verses a combined rate quoted at the time of LfD formation. <br />The storm sewers costs are being calculated on a per front foot basis since all Pots front <br />the street and results in a distribution acceptable to the owner. One hundred percent of <br />the assessable costs for the storm and sanitary sewers are being born by the owner and <br />the code provides the flexibility to distribute in this manner if requested by the single <br />effected party. Staff recommends approval of the assessment distribution. <br />