Laserfiche WebLink
heard all evidence and argument presented, fully considered the <br />same and has reported his adopted findings to the City Council. <br />Because of the general proximity of the sanitary sewers <br />constructed in Basins "I", "J", and "Ii", because the work was done <br />during the same construction season, because the historic public <br />notices, hearings, proceedings and information have been the same <br />for the specially benefitted properties, and because of savings in <br />engineering and administrative costs, it is equitable that the cost <br />of the three separate contracts under which the local improvement <br />has been constructed in 1993 be combined when calculating the <br />assessments for the individual specially benefitted properties. <br />Parcels for which sanitary sewers were constructed earlier but <br />which were not fully assessed until being included in this local <br />improvement district are to be assessed based on the same unit <br />values as the 1993 construction. <br />The extra capacity constructed in existing sanitary sewer <br />interceptor lines in the River Road and Santa Clara areas was done <br />with the intention and determination that the costs of that extra <br />capacity benefitted the property to be served by such interceptors <br />and that the costs therefore would be equitably spread to all <br />properties served within the River Road and Santa Clara areas. <br />The $O.fl25 per square foot local SDC included in the billing <br />equitably spreads such extra capacity costs to all the properties <br />in the River Rvad and Santa Clara areas. Without such extra <br />capacity to receive sewage the sanitary sewer laterals and service <br />lines recently constructed could not function and would not <br />IJK ORDINANCE - Page Z <br />