Laserfiche WebLink
a~ a <br />FINDINGS AND RECOMMENDATIONS <br />SUBJECT: BASINS "L", "M" AND "V" SANITARY SEWERS IN THE SANTA <br />CLARA AREA, LEVYING FINAL ASSESSMENT FOR LOCAL <br />IMPROVEMENT JABS 2922, 2923 AND 3~~4; CONTRACTS 94-08, 94-07 <br />AND 94-06 <br />BACKGRGUND <br />On May 9,1994, the Eugene City Council formed the local improvement district for sanitary <br />sewers in the Santa Clara area for basins "L", "M" and "V". This district encompasses those <br />parcels served by the sanitary sewers constructed by the City of Eugene in 1994 in the Santa <br />Clara area, properties served by sewers built in 1994 by Lane County for the City, and <br />properties served by previously constructed sewers which became functional when they were <br />connected to the sewer system built in 1994. The majority of the properties taking sewer <br />service from these facilities will be assessed based on a distribution of the cumulative <br />construction and staff service casts for the three basins. Included in the billing to developed <br />parcels will be the local and regional sanitary sewer Systems Development Charges ~SDC} <br />which are distinct charges not related to the sewer assessment calculation. <br />Prior to the April 14,1994, hearing regarding the formation of the local improvement district <br />SLID}, property owners who will bear the costs of the improvement were notified in advance <br />of the minimum 1o-days notice required in section 7.165 of the Eugene Code SEC}. Notice of <br />Proposed Final Assessment was provided as required by EC 7.185, <br />The sanitary sewer projects were constructed under three separate City contracts: 1} Basin <br />"L", 94-oS; 2} Basin "M", 94-07; and 3} Basin "V", 94-06. These projects complete the fifth <br />year of a seven-year construction effort to provide sewers to the River Road -Santa Clara <br />Area. <br />A final assessment informational session was held March 15, 1995 at the Santa Clara Fire <br />Station #2 at 3939 River Road for property owners in this LID. Approximately 64 property <br />owners attended. Information was provided on financing, methodology, and calculation of <br />assessments. <br />The project construction has been completed. The project costs have been assimilated and <br />distributed in accordance with Chapter 7 of the Eugene Code. The property owners were <br />notified of the final assessment hearing at least ten Flo} days prior to the hearing. <br />ASSESSMENTS <br />The total assessable cost for the sewers built through the three contracts administered by the <br />City for Basins "L", "M" and "V" was $5,905,580.39. The total assessable cost Includes <br />contractor payments, .professional staff charges, finance administration fee, short-term <br />SANTA CLARA SEWER BASINS "L~ "M" AND "V~ Page 1 <br />FINAL ASSESSMENT -FINDINGS AND RECOMMENDATIONS <br />