My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20022
COE
>
City of Eugene
>
Ordinances
>
1990s No. 19660-20183
>
Ordinance No. 20022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:48:28 PM
Creation date
11/25/2008 2:45:11 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
20022
Document_Title
Ordinance levying assessments for paving, curbs, gutters, sidewalks, storm sewers, street trees and street lights on Terry Street between Royal Avenue & Barger Drive; and declaring an emergency. (Contract 94-30) (Job #2813)
Adopted_Date
8/7/1995
Approved Date
8/7/1995
CMO_Effective_Date
8/7/1995
Signer
Ruth F. Bascom
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br />July 25,1995 <br />TO: Hearings Official <br />FROM: Les Lyle, City Engineer <br />SUBJECT: PAVING, CURBS, GUTTERS, SIDEWALKS, STORM SEWERS AND <br />STREET LIGHTS ON TERRY STREET BETWEEN ROYAL AVENUE <br />AND BARGER DRIVE. CONTRACT #94-30} JOB #2813} <br />BACKGROUND <br />This project was included in the FY `94' Council adopted Capital Budget, On April 11,1994, the <br />City Council approved a motion authorizing staff to proceed with design, bidding and right-of <br />way acquisition for this project. Also, on Apri111,1994, the City Council adopted Ordinance <br /># 19942 authorizing eminent domain proceedings for the acquisition of necessary rights-of-way <br />for this project. On May 18,1994, the Lane County Commissioners approved Order #94-5-18- <br />16authorizing the City to include two ~2}properties that are outside the City boundaries, to be <br />included with the proposed LID boundaries. Property owners will bear 46.3% percent of the <br />costs for the local improvement district SLID). The City Council formed the LID on June 29, <br />1994. The project has now been completed, and final assessment costs have been calculated. <br />PROJECT <br />The prof ect included construction of a 44-foot wide roadway with 11-foot travel Ianes, 5-foot <br />bike lanes with curbs and gutters, storm sewers, street trees, street lights and continuous sidewalk <br />on the east side of Terry Street. <br />ASSESSMENT <br />Under City of Eugene assessment policy, 46% percent of the improvement costs will be <br />distributed to the abutting property owners. The final assessment unit costs are listed below: <br />20-faot <br />36-foot <br />44-foot <br />Sidewalks <br />Cost to City: <br />$ 4011 /front foot <br />$ 72.26/front foot <br />$ 88.25/front foot <br />$ 15.94/front foot <br />$489,555.42 <br />The assessable unit costs listed below are based on the low bids received prior to construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.