Laserfiche WebLink
MEMORANDUM <br />July 25,1995 <br />TO: Hearings Official <br />FROM: Les Lyle, City Engineer <br />SUBJECT: PAVING, CURBS, GUTTERS, SIDEWALKS, STORM SEWERS AND <br />STREET LIGHTS ON TERRY STREET BETWEEN ROYAL AVENUE <br />AND BARGER DRIVE. CONTRACT #94-30} JOB #2813} <br />BACKGROUND <br />This project was included in the FY `94' Council adopted Capital Budget, On April 11,1994, the <br />City Council approved a motion authorizing staff to proceed with design, bidding and right-of <br />way acquisition for this project. Also, on Apri111,1994, the City Council adopted Ordinance <br /># 19942 authorizing eminent domain proceedings for the acquisition of necessary rights-of-way <br />for this project. On May 18,1994, the Lane County Commissioners approved Order #94-5-18- <br />16authorizing the City to include two ~2}properties that are outside the City boundaries, to be <br />included with the proposed LID boundaries. Property owners will bear 46.3% percent of the <br />costs for the local improvement district SLID). The City Council formed the LID on June 29, <br />1994. The project has now been completed, and final assessment costs have been calculated. <br />PROJECT <br />The prof ect included construction of a 44-foot wide roadway with 11-foot travel Ianes, 5-foot <br />bike lanes with curbs and gutters, storm sewers, street trees, street lights and continuous sidewalk <br />on the east side of Terry Street. <br />ASSESSMENT <br />Under City of Eugene assessment policy, 46% percent of the improvement costs will be <br />distributed to the abutting property owners. The final assessment unit costs are listed below: <br />20-faot <br />36-foot <br />44-foot <br />Sidewalks <br />Cost to City: <br />$ 4011 /front foot <br />$ 72.26/front foot <br />$ 88.25/front foot <br />$ 15.94/front foot <br />$489,555.42 <br />The assessable unit costs listed below are based on the low bids received prior to construction <br />