My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20039
COE
>
City of Eugene
>
Ordinances
>
1990s No. 19660-20183
>
Ordinance No. 20039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:48:33 PM
Creation date
11/25/2008 3:18:11 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
20039
Document_Title
Levying assessments for construction of sidewalks & driveway approaches for School Dist. 4J at two locations 1) south side of W. 18th Ave. from Bailey Hill Rd. to 2200-ft. W 2) north side of 30th Ave from Harris St. to University St.; declaring emer
Adopted_Date
2/26/1996
Approved Date
2/26/1996
CMO_Effective_Date
3/28/1996
Signer
Ruth F. Bascom
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br />Date: February 6,1995 <br />From: Les Lyle, City Engineer <br />To: Hearings official <br />SUBJECT: CONSTRUCTION OF SIDEWALKS AND DRIVEWAY APPROACHES FOR <br />EUGENE SCHOOL DISTRICT 4J AT TWO (2) LOCATIONS 1) SOUTH SIDE OF <br />WEST 18TH AVENUE FROM BAILEY HILL ROAD TO 2200-FEET WEST 2) <br />NORTH SIDE OF 30TH AVENUE FROM HARRIS STREET TO UNIVERSITY <br />STREET. (CONTRACT #95-12) (JOB #3344) <br />BACKGRgUND <br />This project was initiated by Council Motion on September 26,1994. The improvements involved <br />only one property owner 44J School District} who will bear 100 percent of the assessable cost. <br />Based on the Council Motion, city staff proceeded with bidding of the project, as provided for in the <br />Eugene Code 1.16945} and 1.16041}, on September 26,1994 and the City Council formed the Local <br />Improvement District 4LID} on June 14,1995. The project has been completed, and final <br />assessment costs have been calculated. <br />PROJECT <br />The project included construction of a 5-foot wide sidewalk with driveway. <br />ASSESSMENT <br />Under City of Eugene assessment policy,100 percent of the improvement costs will be distributed <br />to the abutting property owner. Below are the final unit assessable costs. <br />SidewalklDriveway $24.951front foot <br />Cost to City: <br />$1,719.07 <br />The assessable unit costs listed below are based on the low bids received prior to construction and <br />were quoted to property owners at the LID hearing following the bid opening: <br />Sidewalk/Driveway $27.62/front foot <br />RECOMMENDATION <br />The final improvement costs are Iowerthan quoted at the local improvement hearing and are <br />comparable to projects of similar size, Staff recommends approval of the assessment as calculated <br />and that the Council levy the f nal assessment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.