Laserfiche WebLink
hearings official recommend that the drainage area be deducted in the calculation of assessment <br />for the 43 properties where drainage areas meet all three criteria. The other properties considered <br />are not recommended for inclusion because the drainage channels on these properties do not <br />meet one or more of the criteria listed above. <br />D lines <br />The 1995 LID Included usable, previously constructed "dryline" sewers in Basin N on Blackfoot <br />Cul~de-sac, Travis Avenue, Hyacinth Street, and Maranta Street. Typically, these sewers were <br />installed in the public rights-of way by private subdivision developers in the 1970s. These <br />sewers are called "drylines" because they could not function until they were connec~d to a <br />working sewer system, In order to make these "drylines" functional, the City incurred certain <br />costs, including costs for engineering research and design, inspection, cleaning, connection to the <br />sewers to be installed in 1995, administration services, and short-term financing, A separate cost <br />per square foot is calculated for these system elements. This approach is consistent with prior <br />LID practices and is appropriate due to the prior investment incurred by the abutting properties. <br />Assessment Amounts <br />The proposed assessment costs and billings were calculated using the following figures: <br />Total lateral cost: <br />Total lateral area: <br />$ 3,426,047.92 <br />12,290,162 square feet <br />Total service line cost: <br />Total connection points: <br />$ 1,318,864.30 <br />1,033 <br />Unit costs are: <br />Sanitary sewer lateral: <br />for area wlin 160' <br />$ 0.3038/square foot <br />Sanitary sewer service: <br />for each connection point <br />Local SDC <br />Regional SDC <br />(EDU =equivalent dwelling unit) <br />$1,231.431each <br />$0.025/square foot of total lot <br />$332.00/EDU <br />Properties served by the sewer installed by Lane County through an intergovernmental agreement <br />with the City of Eugene and properties not previously assess for adjacent sewers constructed in <br />SANTA CLARA AREA SEWER BASINS "N" "P" "Q" AND "R" Page 3 <br />FINAL ASSESSMENT W FIl`IDINGS AND RECCMMENDATtflNS <br />