My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20055
COE
>
City of Eugene
>
Ordinances
>
1990s No. 19660-20183
>
Ordinance No. 20055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:48:43 PM
Creation date
11/25/2008 3:52:49 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
20055
Document_Title
Vacating following described two 14-ft. wide alleys between Olive St., Willamette St., 10th Ave., & 11th Ave. to wit & declaring an emergency to exist: all of 14-ft. wide alleys within Block 16, Mulligan's Donation to Lane Cty. (see text in full)
Adopted_Date
7/22/1996
Approved Date
7/22/1996
CMO_Effective_Date
7/22/1996
Signer
Ruth F. Bascom
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
im rovement funds shall be used for street improvements which in some manner benefit tiransit. <br />P <br />S.S.1,Z In the event LTD does not construct the Station, LTD further <br />agrees to undertake an extensive renovation of the 10th Avenue bus area which would include <br />new pavement, improved sidewalk treatment, new shelters, additional passenger amenities and <br />improved lighting along the entire tburee ~3} block length of the Corridor. Such improvements <br />shall be made in compliance with all federal, state and local Laws and regulations. <br />5.5,Z The Project Completion Date is defined as the date upon which the Garage <br />Project architect of record issues a Certifncate of Completion and Agency indicates its acceptance- <br />of the improvements, subject to the provisions of the construction and acquisition agreements <br />between Agency and Charles Pankow Binders, Ltd. ~"Garage Project Contracts{'}. <br />5.5.3 The property described in Paragraph 1 is presently being utilized for <br />parking. LTD has applied for and received conditional approval for funds under Grant No. OR- <br />03-0045 to be utilized for structured functional replacement parking. LTD is required, in order <br />to obtain Chase funds, to enter into an intergovernmental agreement with the City of Eugene for <br />the functional replacement parking portion of the project. <br />5.5.3.1 LTD acknowledges that City has been negotiating with Pankow <br />Construction for a Garage Project and that LTD has signed off on the FTA required items to be <br />included in the Parking Mitigation Sales-Purchase Agreement by way of a letter from Jerry Gill <br />to Jeanette Bailor dated January 9, 1996 signed by both. City further acknowledges that LTD's <br />requirements for the utilization of the funds to be paid hereunder is that those funds be dedicated <br />to replacement parking within two blocks of the Station site, with it a ZO-year use requirement. <br />for 1?6 public parking spaces, and utilizing FTA regula~ons set forth in the Bailor sign~off <br />referenced above. <br />5.5.4 Agency and City acknowledge that the project funds provided by LTD to <br />A enc and Ci are derived from an FTA grant referenced above, entered into between FTA <br />g Y tY <br />and LTD, which provides that the Federal Government retains a continuing interest in the <br />structures, a ui ment and other facilities acquired ar constructed through use . of such federal <br />qp <br />funds. Agency and City fi~rther acknowledge the continuing control provisions, as such <br />provisions are included within 49 USC § 16o2~a}~Z}~A}~u}, and within the grant agreement . <br />between FTA and LTD . The City agrees to cooperate with LTD's Purchasing Agent's <br />reasonable monitoring of the performance of City's construction contractor, at least to the extent <br />such monitorin is conducted to reassure LTD of federal standards compliance for this project, <br />g <br />including those regarding sources of materials and payment of prevailing wages. The City <br />agrees, by the execution hereof, that no more than one hundred seventy-six ~1?6} func~onal <br />replacement parking spaces shall be reimbursed from FTA project resources and. that no <br />additional betterments are eligible, and that such space shoo remain, available for public parking. <br />for the Life of the project. ~ . <br />. ~ : ~ ~ ~~ ~ 5.5.4.1 City further cvvena~ats and. agrees,. to be~.eligiblet for the funda:~set:. <br />forth in Paragraph 5.5.3 , that ~a} Agency and City agree to take no action which would interfere <br />with the use of this structure as a parking facility for the life of the project, a period of twenty <br />ZQ ears • and ETA's interest in the parking stnucture may not. be assigned or transferred <br />C ~ y ~~ <br />Page 4 - nNTERG~VERNMENTAL AGREEMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.