My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCAgenda-4/12/04Mtg
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-04/12/04Mtg
>
CCAgenda-4/12/04Mtg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:14:02 PM
Creation date
4/9/2004 2:29:43 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda
CMO_Meeting_Date
4/12/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Findings <br /> <br />I 33g-1-. Providing key urban services, such as water, to areas outside the UGB increases pressure <br /> for urban development in rural areas. This can encourage premature development outside <br /> the UGB at rural densities, increasing the cost of public facilities and services to all users <br /> of the systems. <br /> <br />[ 3~. Land application ofbiosolids, treated wastewater, or cannery waste on agricultural sites <br /> outside the UGB for beneficial reuse of treated wastewater byproducts generated within <br /> the UGB is more efficient and environmentally beneficial than land filling or other means <br /> of disposal. <br /> <br />I ~..5g-3. Lane County land use data show that, outside the UGB, land uses consist of: <br /> <br /> a. Those which are primarily intended for resource management; and <br /> <br /> b. Those where development has occurred and are committed to rural development <br /> as established through the exceptions process specified in Statewide Planning <br /> Goal 2. <br /> <br /> Policies <br /> <br /> G.25 Wastewater and water service shall not be provided outside the UGB except to the <br /> following areas, and the cities may require consent to annex agreements as a prerequisite <br /> to providing these services in any instance: <br /> <br /> a. The area of the Eugene Airport designated Government and Education on the <br /> Metro Plan Diagram, the Seasonal Industrial Waste Facility, the Regional <br /> Wastewater Biosolids Management Facility, and agricultural sites used for land <br /> application ofbiosolids and cannery byproducts. These sites serve the entire <br /> metropolitan area. <br /> <br /> b. An existing development outside the UGB when it has been determined that it <br /> poses an immediate threat of public health or safety to the citizens within the <br /> Eugene-Springfield UGB that can only be remedied by extension of the service. <br /> <br /> In addition, under prior obligations, water service shall be provided to land within the <br /> dissolved water districts of Hillcrest, College Crest, Bethel, and Oakway. <br /> <br /> G.26 Plan for the following levels of service for rural designations outside the UGB within the <br /> Plan Boundary: <br /> <br /> a. Agriculture, Forest Land, Sand and Gravel, and Parks and Open Space. No <br /> minimum level of service is established. <br /> <br /> III-G-12 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.