My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCAgenda-4/12/04Mtg
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-04/12/04Mtg
>
CCAgenda-4/12/04Mtg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:14:02 PM
Creation date
4/9/2004 2:29:43 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda
CMO_Meeting_Date
4/12/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bids were opened on March 11, 2004, with Wildish Construction Co. as the apparent low bidder. The <br />property owners were notified of the pending Local Improvement District (LID) hearing ten (10) days <br />prior to the hearing as required by Eugene Code. The purpose of the LID formation hearing was to <br />review the bid information, confirm whether the LID should be formed and to identify any special <br />conditions that should be included in the resolution forming the LID. The hearing was held on March <br />17, 2004, with five property owners attending (see attached Hearings Official Minutes). <br /> <br />The improvements will consist of a 44-foot wide road with two travel lanes, a center turn lane for a <br />portion of the project with landscape medians, bicycle lanes, curb and gutter, sidewalks, street lights, a <br />traffic signal, street trees, traffic calming and wastewater and storm water drainage systems. The <br />improvements to Garden Way also address two hazardous 90-degree curves and safety issues at the <br />intersection with Martin Luther King Jr. Boulevard. Traffic signal modifications will also be made at <br />the intersection of Garden Way and Martin Luther King Jr. Boulevard. <br /> <br />Timing <br />All necessary steps have been completed as prescribed by the Eugene Code for the initiation and <br />formation of an LID. Delay in the formation of the LID will delay completion of the road improvement <br />project. <br /> <br />OPTIONS <br />Per Section 7.166(3) of the Eugene Code, the City Council can take the following actions: <br /> 1. Approve the resolution forming the LID. <br /> 2. Substantially modify the improvement, rebidding if necessary, and then conduct a hearing on the <br /> modified improvements. <br /> 3. Delay the approval not more than 15 days. <br /> 4. Abandon the improvements. <br /> <br />STAFF RECOMMENDATION <br />Staff recommends approval of the Minutes, Findings and Recommendations of the Hearings Official and <br />adoption of the resolution forming the Local Improvement District as described. The bids received are <br />comparable to projects of similar size and scope and formation of the LID will be consistent with City <br />Council adopted policy. <br /> <br />SUGGESTED MOTION <br />Move to approve the Hearings Official's Minutes, Finding and Recommendations of April 5, 2004. <br /> <br />Move to adopt Resolution 4789 forming a Local Improvement District for paving, constructing curbs <br />and gutters, sidewalks, median, street lights, traffic signal, street trees, wastewater and stormwater <br />drainage on Garden Way from Sisters View Avenue to Martin Luther King Jr. Boulevard, and the North <br />side of Martin Luther King Jr. Boulevard from Marche Chase Drive to I-5. <br /> <br /> L:\CMO\2004 Council Agendas\M040412\S0404122D.doc <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.