My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCAgenda-4/12/04Mtg
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-04/12/04Mtg
>
CCAgenda-4/12/04Mtg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:14:02 PM
Creation date
4/9/2004 2:29:43 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda
CMO_Meeting_Date
4/12/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
resolution authorizing acquisition of needed right of way through the eminent domain process for <br /> the Garden Way project. <br /> <br /> .The Lane County Board of Commissioners on December 3, 2003, by Board Order 03-12-3-8 <br /> authorized the City of Eugene to assess the nine (9) properties outside the City limits for this <br /> project. <br /> <br /> Bids were opened on March 11, 2004, with Wildish Construction Co. as the apparent low bidder. <br /> The property owners were notified of the pending Local Improvement District (LID) hearing ten <br /> (10) days prior to the heating. <br /> <br />PROJECT <br /> <br />The improvements will consist of a 44-foot wide road with two travel lanes, a center turn lane for <br />a portion of the project with landscaped medians, bicycle lanes, curb and gutter, sidewalks, street <br />lights, a traffic signal, street trees, traffic calming and wastewater and storm water drainage <br />systems. The improvements to Garden Way also address two hazardous 90-degree curves and <br />safety issues at the intersection with Martin Luther King Jr. Boulevard. Traffic signal <br />modifications will also be made at the intersection of Garden Way and 'Martin Luther King Jr. <br />Boulevard. <br /> <br />Based on the low bid received (plus 10 percent contingency), the estimated assessment rate will <br />be: <br /> <br /> Paving 7- foot (per front foot) $ 74.48 <br /> Paving 10-foot (per front foot) $ 106.39 <br /> Sidewalk (per square foot) $ 3.95 <br /> Wastewater (per square foot) $ 0.30 <br /> Wastewater service (per each) $ 3,650.30 <br /> <br /> Total Assessable Cost $ 927,261.89 <br /> Total City Cost $ 2,790,851.61 <br /> Total Project Cost $ 3,718,113.50 <br /> <br />As provided in the Eugene Code, the assessable portion of the cost of creating and paving the <br />street width is assessed to adjacent property based on the front footage of the property. <br />Properties that are zoned for residential will be assessed for seven (7) feet of pavement width <br />along their frontage. Properties zoned for commercial use will be assessed for ten (10) feet of <br />pavement width. Single family residential properties that are fully developed or vacant but under <br />½ acre pay for a maximum of 100 feet and a minimum of 50 feet of frontage. Properties that are <br />greater than ½ acre and are partially developed with single family residential will pay for a <br />maximum of 100 feet of frontage at the time of assessment, with the remainder of the frontage <br />assessment being delayed until further development occurs. Vacant properties over ½ acre are <br />not levied an assessment with the LID. Assessment fees will be collected for these vacant <br /> <br />PROPOSED PAVING, CURBS AND GUTTERS, SIDEWALKS, AND RELATED IMPROVEMENTS ON <br />GARDEN WAY AND ON THE NORTH SIDE OF MARTIN LUTHER KING, JR. BOULEVARD <br />FORMATION OF LOCAL IMPROVEMENT DISTRICT Page 2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.