Item C: Stormwater Permit and Program Developments
COE
>
City of Eugene
>
Council Agendas 2005
>
CC Agenda - 10/10/05 WS
>
Item C: Stormwater Permit and Program Developments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 10:24:49 AM
Creation date
10/4/2005 9:00:06 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
10/10/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />prepare the FY05 budget assuming no increase in user fees and $2.1 million in service level reductions. <br />The council also voted not to implement a $0.50 user fee increase to fund an enhanced stream corridor <br />acquisition program. The council was aware that the decisions would result in a program which would <br />still meet the requirements of the 1994 NPDES permit, but that implementation other CSWMP measures <br />would be over a much longer period of time, and some non permit-related program measures would be <br />eliminated. Staff informed the council of the status of the City's new NPDES permit, which at that time <br />not yet been issued, and the likelihood that the new permit would contain more rigorous conditions <br />which would, at a minimum, require reallocation of resources within the program. <br /> <br />The City Council subsequently approved a FY05 budget which reflected the restoration of funds for <br />some of the services that had been identified for cuts following the 2003 program review. User fees <br />were increased 2.5% effective July 1, 2004, to restore funding for the Willamette River bank cleanup, <br />the NeighborWoods program, and financial support for the Long Tom and McKenzie Watershed <br />Councils. To allow continued funding of stormwater services consistent with the proposed FY06 <br />budget, stormwater user fees were increased by 3.5% effective July 1, 2005. <br /> <br />Permit Renewal <br />The City joined efforts with the five other permittees under Phase I of the NPDES program during the <br />permit renewal process beginning in 2003 and culminating with new NPDES stormwater permits for all <br />six permittees in March 2004. The four Portland-area permits (issued to the City of Portland, Clean <br />Water Services, Gresham, and Clackamas County and their co-permittees) were subsequently <br />challenged, pulled for reconsideration by DEQ, revised, and re-issued in August 2005. The four <br />Portland-area permittees have been given additional time to compile the results of their internal permit- <br />related evaluation, and are now required to submit an "Evaluation Report" in May 2006. Eugene and <br />Salem remain on the original timeline for submitting evaluation reports with the second annual NPDES <br />report, due to DEQ by December 1, 2005. <br /> <br />New NPDES Permit & Program Evaluation <br />The new permit includes additional requirements in the areas of water quality monitoring, reporting, <br />evaluation, addressing specific problem pollutants, and public involvement. An evaluation of the City's <br />program in light of new permit requirements has been completed and public outreach is now underway. <br />The evaluation process and results are summarized in Attachment A ("National Pollution Discharge <br />Elimination System Stormwater Management Plan"). <br /> <br />The evaluation confirmed the importance of core stormwater program activities including street <br />sweeping, system cleaning, education and volunteer programs, vegetation management, tree planting, <br />erosion control, illicit discharge enforcement, spill response, and water quality monitoring. The <br />evaluation identified two gaps in the City's program which need to be filled and specific program <br />adjustments which need to be made in order to remain in compliance with the City's permit. <br /> <br />Program Gap - Stormwater Development Standards <br />One gap identified in the permit-related program evaluation is that Eugene lacks post-construction <br />stormwater quality development standards ("stormwater development standards"). Stormwater <br />development standards are regulations for locating, designing, constructing, and maintaining water <br />quality facilities for new development and significant re-development. These standards are part of the <br />current program workplan, and a draft ordinance involving changes to Chapter 9 and Chapter 6 of the <br />Eugene City Code is under development. Public outreach is underway, including review of an <br />ordinance summary by the Public Works Stormwater Department Advisory, and scheduled presentations <br /> <br />L\CMOI200S Council AgendasIMOSIOIOISOSIOIOC.doc <br />