Laserfiche WebLink
<br />TABLE 8 <br /> <br /> <br />Design Percent of Component Design Percent of Component Value <br />Capacity Facility Cost Value Capacity Facility Cost <br />49,000,000 22.0% $22,973,702 1,000,000 3.1% $202,500 <br />175,000,000 43.0% $44,903,145 16,500,000 96.6% $6,409,500 <br />66,000 19.0% $19,840,924 1,000 0.2% $11,250 <br />71,600 16.0% $16,708,147 1,420 0.2% $11,250 <br /> 100.0% $104,425,918 100.0% $6,634,500 <br /> <br />Cost of 55 Component { Design 55 daily capacity = Cost per pound ofSS per day <br />($16708,147 / 7-1,600) + $11,250 /1,420) pounds per day = $241.27 per pound <br /> <br />* <br /> <br />The unit cost of Peak Flow is calculated on the basis of average daily plant capacity of 49,000,000 to enable recovery of costs from system users. <br />