My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4776
COE
>
City of Eugene
>
Resolutions
>
2003 No. 4746-4781
>
Resolution No. 4776
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:48:41 PM
Creation date
10/13/2005 6:45:34 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
9/24/2003
Document_Number
4776
CMO_Effective_Date
10/1/2003
Repeal_Date
6/28/2004
Author
Mary H. Feldman
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />TABLE 8 <br /> <br /> <br />Design Percent of Component Design Percent of Component Value <br />Capacity Facility Cost Value Capacity Facility Cost <br />49,000,000 22.0% $22,973,702 1,000,000 3.1% $202,500 <br />175,000,000 43.0% $44,903,145 16,500,000 96.6% $6,409,500 <br />66,000 19.0% $19,840,924 1,000 0.2% $11,250 <br />71,600 16.0% $16,708,147 1,420 0.2% $11,250 <br /> 100.0% $104,425,918 100.0% $6,634,500 <br /> <br />Cost of 55 Component { Design 55 daily capacity = Cost per pound ofSS per day <br />($16708,147 / 7-1,600) + $11,250 /1,420) pounds per day = $241.27 per pound <br /> <br />* <br /> <br />The unit cost of Peak Flow is calculated on the basis of average daily plant capacity of 49,000,000 to enable recovery of costs from system users. <br />
The URL can be used to link to this page
Your browser does not support the video tag.