Laserfiche WebLink
<br />NO.1 <br /> <br />10/18/05 <br /> <br />3. If the alleged error is in the mapping of an upland wildlife <br />habitat site or a riparian site (as opposed to the measurement <br />of the site's conservation setback): <br />a. A detailed written description of the mapped area claimed <br />to be incorrectly included within the resource site in <br />question, including an inventory list of plant species and <br />the relative frequency of plant species listed; <br />b. The location of the boundary of the resource as mapped <br />by the city in the Goal 5 Water Resources Conservation <br />Plan; <br />c. The alleged correct location of the boundary of the /WR <br />conservation area for the resource in question; and\ <br />d. Color photographs of the area claimed to be incorrectly <br />included within the resource site in question. <br />4. If the alleged error is in the mapping of a wetland site (as <br />opposed to the measurement of the conservation setback <br />area), a wetland determination or a wetland delineation report <br />and map, and a signed concurrence letter from the Oregon <br />Department of State Lands, indicating that the determination or <br />report is consistent with Oregon Administrative Rules <br />pertaining to mapping of jurisdictional wetlands. The map <br />must show all pertinent tax lot lines and rights-of-way <br />boundaries. <br />(b) Approval Criteria. <br />1. For allegations of error on the Goal 5 Water Resources <br />Conservation Plan Map: at the time the city adopted the Goal 5 <br />Water Resources Conservation Plan Map, that Map showed an <br />incorrect location of the identified Goal 5 Water Resource Site. <br />2. For allegations of error on the Eugene Overlay Zone Map: at <br />the time the city applied the /WR Water Resources <br />Conservation Overlay Zone to the subject lot(s), the city was <br />incorrect in its determination that the lot(s) contained a Goal 5 <br />Water Resource Site or a /WR Water Resources Conservation <br />Area. <br />(4) Amendment of the Goal 5 Water Resources Conservation Plan Map or the <br />Eugene Overlay Zone Map. As a result of the Type I or Type II processes <br />described above, if the city determines that there is an error in the Goal 5 <br />Water Resources Conservation Plan Map or the Eugene Overlay Zone <br />Map, the planning director shall issue an order amending the applicable <br />map(s) to correct the error. <br /> <br />9.4970 /WR Water Resources Conservation Overlav Zone - State Wetland Notification. <br />The city shall notify the Oregon Department of State Lands (DSL) concerning <br />land use and building permit applications within wetland sites consistent with <br />state law. <br /> <br />9.4980 /WR Water Resources Conservation o verla v Zone - Development Standards. <br />The following standards apply only as specifically required by EC 9.4930(3) or <br />EC 9.8030(21): <br /> <br />Ordinance - 15 <br />