Laserfiche WebLink
<br />NO.1 <br />10/18/05 <br />Section 15. Table 9.7810 of the Eugene Code, 1971, is amended by adding an entry for <br /> <br />"IWR Water Resources Conservation Overlay Zone" in alphabetical order therein to provide: <br /> <br /> Table 9.7810 Equivalent Zones and Overlay Zones <br /> Urbanizable land Zones Eugen"e Zones <br />AG/U L Agricultural AG Agricultural <br />PL/UL Public Land PL Public Land <br />LDR/UL Low-Density Residential R-1 Low Density Residential <br />MDR Medium-Density Residential R-2 Medium Density Residential <br />GO/U L General Office GO General Office <br />C/UL Neighborhood Commercial C-1 Neighborhood Commercial <br />CC/U L Community Commercial C-2 Community Commercial <br />LMI/UL Light-Medium Industrial 1-2 Light-Medium Industrial <br />HI/UL Heavy Industrial 1-3 Heavy Industrial <br />Urbanizable land Zonina Overlay Eugene Overlay Zones <br />ISR Site Review ISR Site Review <br />ICAS Commercial Airport Safety ICAS Commercial Airport Safety <br />/WR Water Resources Conservation /WR Water Resources Conservation <br /> Overlay Zone Overlay Zone <br /> <br />9.8025 <br /> <br />Section 16. Section 9.8025 of the Eugene Code, 1971, is amended, to provide: <br /> <br />Adiustment Review - General Reauirements. <br />(1) Except as provided in subsection (2), [Unless .....:lived by the pl:lnning <br />director.] the adjustment review application shall be prepared by one or more of <br />the following professionals unless waived by the planning director. <br />(4a) Oregon licensed architect. <br />(2b) Oregon licensed civil engineer. <br />(3c) Oregon licensed landscape architect. <br />(4) 1\ member of the I\merican Institute of Certified PI:lnners.] <br />(ad) Oregon licensed land surveyor. <br />(2) An application for adjustment review under EC 9.8030(21) shall comply <br />with the following: <br />(a) Unless waived by the planning director, the application shall be <br />prepared by one or more of the following professionals: <br />1. Oregon licensed architect. <br />2. Oregon licensed civil engineer. <br />3. Oregon licensed landscape architect. <br />4. A professionally trained botanist or biologist, with sufficient <br />training and experience in planning and design to evaluate <br />consistency of the application with all applicable standards. <br />(b) Unless waived by the planning director, if the application is not <br />prepared by a professionally trained botanist or biologist, one or <br />more of the professionals preparing the application shall have <br />sufficient professional expertise and training in field botany or <br />related biological sciences to evaluate consistency of the <br />application with application standards. <br /> <br />Ordinance - 23 <br />