Laserfiche WebLink
<br />9.4940 <br /> <br />9.4950 <br /> <br />9.4960 <br /> <br />restrictions of the provisions of subsections (2), (3) and (4) of this section if the <br />authorization is part of one of the following: <br />(a) A site review plan; <br />(b) A conditional use permit; <br />(c) A tentative subdivision or tentative cluster subdivision submitted and <br />approved after August 1, 2001; <br />(d) A greenway permit; or <br />(e) A planned unit development. <br /> <br />IWR Water Resources Conservation Overlay Zone - Conveyance of <br />Stormwater Maintenance Easement. Within the /WR conservation area, the city <br />shall have the authority to require conveyance of a maintenance access easement <br />for any natural or human made stormwater facility as a condition of approval for a <br />land use permit. Maintenance access easements within the conservation area shall <br />be only for the purpose of allowing access to the stormwater facility for city <br />maintenance staff and equipment and shall be no more than 15 feet wide. <br /> <br />IWR Water Resources Conservation Overlay Zone - Adiustments. <br />(1) Adjustments to the provisions of EC 9.4920 may be made subject to <br />compliance with the criteria for adjustment in EC 9.8030(21)(a), (b) or (c). <br />(2) Adjustments to the provisions of EC 9.4930 or 9.4980 may be made subject to <br />compliance with the criteria for adjustment in EC 9.8030(21 )(d). <br /> <br />IWR Water Resources Conservation Overlay Zone - Map or Zone Error. The <br />provisions of this section apply in the case of an alleged error in the mapping of a <br />Goal 5 resource site on the Goal 5 Water Resources Conservation Plan Map and/or <br />in the case of an alleged error in the application of the /WR Water Resources <br />Overlay Zone to a specific lot. With respect to alleged errors in the application of the <br />overlay zone, the provisions of this section apply instead of the zone change <br />procedures and criteria described at EC 9.8850 through 9.8865. This section <br />provides the only basis for removal of the /WR Water Resources Overlay Zone or <br />corrections to the Goal 5 Water Resources Conservation Plan Map. <br />(1) Initial Consultation. An applicant may request an initial consultation with city <br />staff to assist the applicant in determining whether an application under <br />subsection (2) or (3) of this section is the most appropriate application for the <br />specific error alleged. <br />(2) Correction Based Solely on Aerial Photography or Geographic <br />Information System Data. An application submitted pursuant to this <br />subsection shall be processed under the Type I application procedure (EC <br />9.7100 - 9.7120). <br />(a) Application Requirements. <br />1. A form provided by the city and a fee established pursuant to EC <br />chapter 2. <br />2. For allegations of error on the Goal 5 Water Resources <br />Conservation Plan Map: identification of the Goal 5 Water <br />Resource Site alleged to have been incorrectly mapped on the Goal <br />5 Water Resources Conservation Plan Map. <br /> <br />Ordinance - 12 <br />