My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 44-23-01-F -- Final Public Contracting Rule 2022
COE
>
City of Eugene
>
Administrative Orders
>
2023
>
Admin Order 44-23-01-F -- Final Public Contracting Rule 2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 3:13:40 PM
Creation date
3/7/2023 8:48:00 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
3/6/2023
Document_Number
44-23-01-F
CMO_Effective_Date
3/6/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A to Administrative Order No. 44-23-01-F <br />City of Eugene Public Contracting Rules 2022 – Part 2 Page 127 <br /> <br />delivery of an early budget or GMP, financing, historic preservation, difficult remodeling <br />projects, and projects requiring complex phasing or highly coordinated scheduling. <br />2) Authority. Contracting Agencies shall use the CM/GC form of contracting only in accordance <br />with the requirements of these division 49 Rules and ORS 279C.337, when a competitive <br />bidding exemption is approved. See particularly Rules 137-049-0600 on “Purpose” and 137- <br />049-0620 on "Use of Alternative Contracting Methods". <br />3) Selection. CM/GC selection criteria may include those factors set forth above in Rule 137- <br />049-0640(2)(b). <br />4) Basis for Payment. The CM/GC process adds specified construction manager Personal <br />Services to traditional design-bid-build general contractor Work, requiring full Contract <br />performance within a negotiated GMP, fixed Contract Price or another maximum Contract <br />Price. For a GMP pricing method, the basis for payment is reimbursable direct costs as <br />defined under the Contract, plus a fee constituting full payment for construction Work and <br />Personal Services rendered, which together shall not exceed the GMP. See GMP definition <br />at Rule 137-049-0610 and Pricing Mechanisms at Rule 137-049-0660. <br />5) Contract Requirements. Contracting Agencies shall conform their CM/GC contracting <br />practices to the following requirements: <br />a) Nature of the Initial CM/GC Services Contract Document. A solicitation for CM/GC <br />Services is a Procurement for a Public Improvement, since the scope of the <br />Procurement includes not only pre-construction Personal Services to be performed by <br />the CM/GC, but also construction Work that is expected to result in a completed Public <br />Improvement. In the traditional CM/GC Services contracting approach, the text of the <br />resulting CM/GC Services Contract will include comprehensive contract provisions that <br />will not only fully govern the relationship between the Contracting Agency and the <br />CM/GC for the pre-construction Personal Services, but will also include the general <br />contract provisions that will control the CM/GC’s providing of the construction Work <br />necessary to complete the project (with any remaining necessary construction-related <br />contract provisions being added through Early Work amendments to the Contract, the <br />GMP amendment to the Contract or, if necessary, a conventional amendment to the <br />Contract). The traditional CM/GC Services contracting approach, however, also <br />contemplates that the Contracting Agency will only authorize the CM/GC to perform the <br />pre-construction Personal Services when the Contract is first executed unless <br />construction Work is specifically included in the initial CM/GC Contract. Under this <br />approach, the construction phase or phases of the CM/GC Services project are not yet <br />authorized, and the Contract only becomes a Public Improvement Contract once the <br />parties amend the Contract, through an Early Work or a GMP amendment, to authorize <br />the construction of a portion of the project or the entire project. See also OAR 839-025- <br />0020, regarding the Bureau of Labor and Industries’ determination of when a Contract <br />for CM/GC Services becomes a “public works” Contract for purposes of paying <br />prevailing wage rates for construction Work under the CM/GC Contract. <br />b) Setting the GMP, Fixed Contract Price, or Other Maximum Contract Price. The GMP, <br />fixed Contract Price or other maximum Contract Price shall be set at an identified time <br />consistent with industry practice and project conditions and after supporting information <br />reasonably considered necessary to its use has been developed, which will normally <br />take place by the end of the design development phase of the project. The supporting <br />information for the GMP must define with particularity both what Personal Services and <br />construction Work are included and excluded from the GMP, fixed Contract Price, or <br />other maximum Contract Price. A set of project drawings and Specifications shall be
The URL can be used to link to this page
Your browser does not support the video tag.