My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20425
COE
>
City of Eugene
>
Ordinances
>
2008 No. 20401-20425
>
Ordinance No. 20425
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:50:46 PM
Creation date
12/10/2008 11:28:10 AM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
20425
Document_Title
Levying assessments for concrete alley paving & constructing wastewater and stormwater systems on 6th Alley between Tyler & Polk streets; providing immediate effective date
Adopted_Date
12/8/2008
Approved Date
12/10/2008
CMO_Effective_Date
12/10/2008
Signer
Kitty Piercy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PUBLIC INVOLVEMENT <br /> <br />This project was iriitiated at the request of the p:roperty owners. The City has continued to <br />consult with the property owners during the process, including the question of additional work to <br />the alley during pavement. The property owners have continuously supported the project and <br />expressed satisfaction regarding the work and the outcome. A final hearing on the proposed <br />assessments was held on November 18, 2008. The minutes of that hearing are attached as <br />Exhibit A. <br /> <br />FINDINGS AND RECOMMENDATION <br /> <br />Notice of the public hearing was provided and all the property owners were given an opportunity <br />to participate in the hearings. <br /> <br />Appropriate notice was given of the public hearing and pending Council action, as required by <br />the Eugene Charter and Code. Letters informing property owners of the hearing and notification <br />to propertY owners of the intent of the City to characterize the assessment as an assessment, not a <br />tax, as required by ORS 305.583(5) were mailed to the property owners. <br /> <br />. The Hearings Officer finds that the project is one for which the assessments are for local <br />improvements as set forth in ORS 310.410 because <br /> <br />1. The assessments do not exceed actual costs; <br />2. The assessments are imposed for a capital construction project that provides a <br />specific benefit for a specific property or rectifies a problem caused by a specific <br />property <br />3. The assessments are imposed in a single assessment upon completion of the <br />project; and <br />4. The assessments allow the property owners to elect to pay the assessment with, <br />interest over at least ten (10) years. <br /> <br />The Hearings OffiCial also finds that the proposed final assessment, calculated and recommended <br />by the City Engineer is reasonable and consistent with the Eugene Code. The Hearings Official <br />recommends that the Council act in accord with the City Engineer's recommendations, adopting <br />the ordinance prepared for the public hearing, levying the assessment as set forth by the City <br />Engineer. <br /> <br />lJ2u <br /> <br />Milo Mecham <br />Hearings Official <br /> <br />November 24, 2008 <br /> <br />PROPOSED FINAL ASSESSMENTS FOR 6TH ALLEY BETWEEN TYLER STREET AND POLK STREET <br />Page) <br />
The URL can be used to link to this page
Your browser does not support the video tag.