processed in accordance with the site review procedures of sections 9.690
<br />to 9.694 of this code. The criteria contained in this section, as well as the
<br />criteria contained in section 9.6SS~b}, shall govern approval or denial of the
<br />site review application. In the event of a conflict in criteria, the criteria
<br />contained in this section shall govern. No building permit shall be issued
<br />priarto completion of the site review process, including any local appeal.
<br />~c} Conditional use ermit. A telecommunication facility which,
<br />pursuant to subsections ~5} or ~6} of this section, requires a conditional use
<br />permit shall be processed in accordance with the conditional use permit
<br />procedures of sections 9.696 to 9.722 of this code, except that the variance
<br />provisions of section 9.108 shall not apply. The criteria contained in section
<br />9.742 of this code and subsections ~8} and ~9} of this section shall govern
<br />approval or denial of the conditions! use permit application. In the event of
<br />a conflict in criteria, the criteria contained in subsections ~S} and ~9} of this
<br />section shall govern. No building permit shat! be issued prior to completion
<br />of the conditional use permit process, including any local appeal.
<br />~4} Collocation of Additional Antennas on Existin Transmission Tower
<br />~a} Permitted use. Collocation of an additional antenna on an
<br />existing transmission tower shall be considered an outright permitted use if
<br />property is zoned GG, PL, MU, SD, C-2, C-3, C-4, I-1, I-2, or I-3 or if the
<br />transmission tower is in any other zoning district and the City specifically
<br />approved, as part of a prior land use process authorizing the transmission
<br />tower, collocation of additional antennas.
<br />fib} Site review. Collocation of an additional antenna on an existing
<br />transmission tower shall be subject to site review approval if property is
<br />zoned AG, RA, R-~, or C-~ and approval for collocation was not granted
<br />through a prior land use process.
<br />~5} Collocation of Antennas on Existin Buildin s Li ht or Utilit Poles
<br />and ~Illater Towers. In addition to collocation on a transmission tower, an antenna may
<br />be collocated on existing buildings, light or utility poles, and water towers.
<br />~a} Permitted use. Such collocation on a building, light or utility
<br />pale, or water tower, shall be considered an outright permitted use provided
<br />thatthe antennas and ancillaryfacilities complywith the standards contained
<br />in section 9.900, the color of the antennas blends in with the existing
<br />structure and surroundings, and one of the following is met:
<br />~ . The property is zoned PL, C-2, C-3, C-4, R-4, I-~ , !-2,
<br />or I-3 and the antennas do not exceed the height limitation of the
<br />zoning district; or
<br />2. The property is zoned AG, RA, R-~ , R-2, R-3, C-1, GG,
<br />MU, SD, or H, and the antennas extend no more than eighteen feet
<br />above, and project no more than two feet horizontally away from the
<br />existing structure.
<br />fib} Site review. Such collocation on a building, light or utility pole,
<br />Ordinance - 3
<br />
|