Laserfiche WebLink
MEMORANDUM <br />Date: March 25,1991 <br />Frvm: Les Lyle, City Engineer <br />Ta: Hearings Ofl•icial <br />SUBJECT: PAVING, CURBS, GUTTERS, SIDEWALKS, SANITARY AND STORM <br />SEWERS ON CRESCENTAVENUE FRGM CRESCENT MEADGWS TG <br />GAME FARM RGAD ~CGNTRACT #9fi-~5~ ~J4B #3341} <br />BACKGRQUND <br />This project was initiated by a irrevocable petition from the two (2) property owners within the <br />Local Improvement District (LID) and will bear 100 percent of the assessable cost. <br />Based on the irrevocable petition, the City Engineer initiated the project, as provided for in the <br />Eugene Code 7.1608}, on November 14,1995 and the City Council formed the LID on July 22, <br />1996. The project has been completed, and final assessment costs have been calculated. <br />City staff met with the two (2) property owners on March 23, and addressed their concerns on <br />the cost of the improvement project. <br />PROJECT <br />The project included construction of 290 feet of a 22-foot wide paved half street}, curbs, <br />gutters, 600 feet of 44-foot wide paving, curbs, gutters, sidewalks, storm and sanitary sewers. <br />ASSESSMENT <br />Under City of Eugene assessment policy, 6l percent of the improvement casts will be <br />distributed to the abutting property owners with the balance financed by the City. Below are the <br />final unit assessable costs. <br />36' Paving <br />Sanitary lateral <br />Sidewalk <br />Storm sewer <br />Cost to City: $126,455.52 <br />Paving <br />Storm <br />Sanitary <br />$41,692.98 <br />$45,927,40 <br />$32, 835.14 <br />$ 77.37/front foot <br />$ 0.21 /sq. foot <br />$ 21.50/front foot <br />$ 0.04/square foot <br />