My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20134
COE
>
City of Eugene
>
Ordinances
>
1990s No. 19660-20183
>
Ordinance No. 20134
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:49:20 PM
Creation date
1/14/2009 1:28:26 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
20134
Document_Title
Ordinance levying assessments for sanitary sewer extension in Prairie Road from 650 feet south of Prairie Road from Beltline Road to Kaiser Avenue, and declaring an emergency. (Contract 97-08) (Job #3437)
Adopted_Date
12/7/1998
Approved Date
12/7/1998
CMO_Effective_Date
1/7/1999
Signer
James D. Torrey
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
although the primary use is industrial. Most of the property in the Industrial Corridor is <br />designated for industrial uses in the Metro Plan. <br />The City desires that all properties in the Industrial Corridor be annexed to the City by <br />2010 and serviced by the City local} and Metropolitan Wastewater Management <br />Commission ~regional~ sewer system by 2000. Both parties recognized that new <br />development in the Industrial Corridor area should be connected to any available City <br />sewer system at the time of development and receipt of a building permit. <br />The City Engineer initiated the project to construct a sewer collection system on March 6, <br />1997, as provided for in the Eugene Code 7. ~ 608} and tf~e City Council formed the LID <br />on June 23,1997. The project has been completed, and final assessment costs have been <br />calculated. <br />PROJECT DESCRIPTION <br />The project included construction of 4465-feet of gravity sewer pipe from 650 feet south <br />of Beltline Road to Kaiser Avenue. <br />ASSESSMENT <br />Under City of Eugene assessment policy, 47 percent of the improvement costs will be <br />distributed to the abutting property owners with the balance financed by the City. The <br />final assessable costs have been calculated based on this sharing of the costs. <br />Total Assessable Cost: $ 774,202.71 <br />Total Assessable Area: 1,353,311 Square Feet <br />Lateral Sewer Line Cost: $ 0.491per square foot of assessable area <br />Service Cost: $ 3,484.201each <br />These final costs reflect an approximately 420 feet extension of this project to the south, <br />enabling two (2} additional lots to become part of the LID. <br />The cost to resurface Prairie Road was distributed among the properties that receive <br />services from this system. The costs were broken into two ~2~ components. Resurfacing <br />cost associated with the main line sewer trench is part of the~lateral cost. The resurfacing <br />cost of the service line trench is part of the service cost. <br />In 1996, a portion of this sewer system was constructed as part of Lane County's <br />improvement project along Irving Road. Properties along Irving Road from the <br />Northwest Expressway west to 1900 feet west of Prairie Road are served by this portion <br />of the system. These properties where not assessed for this construction. Properties <br />along Irving Road, that did not request to be included in the LID, will pay an S-inch <br />equivalent assessment as they connect to the sanitary sewer. <br />SANITARY SEWER EKTENSION IN PRAIRIE ROAD FROM BELTLINE ROAD TD KAISER <br />AVENUE FINAL ASSESSMENT Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.