My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20151
COE
>
City of Eugene
>
Ordinances
>
1990s No. 19660-20183
>
Ordinance No. 20151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:49:24 PM
Creation date
1/14/2009 2:18:36 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
20151
Document_Title
Levying assessments for paving, curbs, gutters, street lights, pedestrial signal, street trees, force main, & storm drainage systems on Barger Dr. from Terry St. to Greenhill Rd.; paving, curbs, gutters, street lights, trees, wastewater .....
Adopted_Date
3/15/1999
Approved Date
3/15/1999
CMO_Effective_Date
3/15/1999
Signer
James D. Torrey
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the described local improvement district as set forth on the assessment roll attached as Exhibit C <br />hereto and incorporated herein by reference. <br />Section 4. The City Council does hereby determine that each parcel of land or lot herein <br />above described is specially benefitted to the extent of the assessment set forth, The Finance Cff cer <br />shall give notice of the assessments to the owners of the assessed parcels advising them the <br />assessment may be paid in full, without interest, within ten days of the effective date of this <br />ordinance. Assessments that remain unpaid after the ten day period are declared to be liens upon the <br />respective lots, parts of lots or parcels of land against which said several amounts are assessed, and <br />may be paid, with interest on the unpaid principal amount commencing ten days after the effective <br />date of this ordinance: <br />4.1 In up to twenty semi-annual installments, including principal and interest at the rate set <br />by the City Manager as provided in E.C. 2.022 through 2.024. <br />4.2 If the property owner so elects, in I20 monthly installments, including principal and <br />interest at the rate set by the City Manager as provided in E.C. 2.022 through 2.024 plus a service <br />charge determined by the City Manager as provided in E. C. 2.020. <br />Section 5. The City Recorder is directed to enter in the docket of City Liens a statement in <br />connection with each unpaid assessment containing the following: <br />5.I A description of each lot, part of lot or acreage specially benefitted by the local <br />improvement; <br />5.2 The name of the owner or reputed owner thereof, or that the name of the owner is <br />unknown; and <br />5.3 The sum assessed upon said property, the amount and date from which interest accrues, <br />ordinance - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.