Laserfiche WebLink
i <br />~ ` <br />r <br />c. ~ An IRU providing the City of Eugene use of 96 ~SMF-28} f hers for a <br />distance of approximately 11 miles, along the route of wILLIAMS other <br />fiber in the railroad right of way in Eugene and Springfield, along with <br />seven points of access ~handholes} to this fiber, such points to consist of at <br />least a 25TA with a service loop, with the option to have installed the <br />vaulted access points described in paragraph a of this subsection, at these <br />same points, with such points to be installed at points to be mutually <br />agreed upon along the wILLIAMS route off of the railroad property. The <br />IRU shall be for a period of 20 years in duration, with a guarantee of <br />negotiations on renewal after 17 years. The City of Eugene will pay <br />wILLIAMS for the fiber to be installed, either through reimbursement to <br />wILLIAMS or payment in advance, upon wILLIAMS sole discretion, <br />such arrangements to be made prior to the initial installation of the 96 <br />wILLIAMS' fibers. The total cost to the City of Eugene for the 96 f bers <br />will be 'VL~illiams' cost for the 96 fibers, the handholes, the pulling of the <br />fiber and other costs associated with the installation ~ excluding trenching} <br />provided Eugene, not to exceed $245,830.25. Final payment for the 96 <br />fibers shall be made no later than when grant of IRU is, effectuated. <br />Maintenance for the 96 fibers will be at $30.00 per route mile per month <br />tapproximately $3 3 0.04 per month}. <br />The seven access points for the Eugene fiber will be located at the point on <br />the railroad right of way where the railroad right of way intersects the right <br />of way of the following cross streets, or in the event there is no actual <br />crossing, at a point of intersection created by the extension of the street <br />right of way across the railroad right of way. <br />• Greenhill Road Eugene} <br />• Bertelsen Road Eugene} <br />• Van Buren Street EEugene} <br />• Charnelton Street Eugene} <br />• Agate Street (Eugene} <br />• Henderson Street, one black from Glenwood Blvd. Springfield} <br />• 14`~ Street ~Springfreld} <br />The exact location of the access paint will be negotiated at the time of <br />installation of the fiber. However, all access points shall be provided on <br />the same side of the right-of-way as the f ber. <br />d. wILLIAMS will provide a mutually agreed upon amount of rack space at <br />wILLIAMS regeneration facilities along the WILLIAMS routes described <br />above, including the Bandon POP, and Reedsport, Walton, Dora, <br />Cleveland, Drain and Jasper Regen sites. WILLIAMS will allow the <br />Consortium Fibers to be installed in an adequate regeneration facility and <br />the regeneration of signals carded on the Consortium Fiber in the same <br />manner provided to other IRU holders, at a cost no higher than the lowest <br />cost charged by wILLIAMS at the same regen site to any other IRU <br />holder at the regen site. For the purposes of this section a regen site shall <br />July 9,1999 <br />Page 4 <br />