Laserfiche WebLink
system development charge for the previous most intense verifiable use per system ~i.e. arks <br />p <br />stormwater, transportation, wastewater} shall be calculated and if it is less than the system <br />development charge for the proposed use, the difference between the system develo ment char e <br />. p g <br />for the previous most intense verifiable use per system and the system development char e for the <br />g <br />proposed use shall be the system development charge required under section 7.705. If the than e in <br />g <br />use results in the system development charge for the proposed use being less than the system <br />development charge far the previous most intense verifiable use per system, no system develo ment <br />p <br />charge shall be required for that system; however, no refund or credit shall be given and an <br />administrative charge shall be imposed. <br />~4} The limitations on the use of credits contained in this subsection shall not <br />apply when credits are given under subsection 7.7304} of this section. A credit shall be iven for <br />. g <br />the cost of a qualified public improvement associated vv~th a development. If a ualified ublic <br />. q p <br />improvement ~s located partially on and partially off the parcel of land that is the subject of the <br />approval, the credit shall be given only for the cost of the portion of the improvement not located on <br />or wholly contiguous to the parcel of land, The credit provided for by this subsection shall be onI <br />.. Y <br />far the public improvement charge imposed for the type of improvement bung constructed and shall <br />not exceed the public improvement charge even if the cost of the capital improvement exceeds the <br />applicable public improvement charge. <br />~5} when establishing the methodology, the city manager may provide for a credit <br />against the public improvement charge, the reimbursement fee, or both, for a capital improvement <br />constructed as part of the development that reduces the development's demand upon existing capital <br />improvements or the need for future capital improvements ar that would otherwise have to be <br />constructed at city expense under the then-existing council policies. <br />~6} Except to the extent that a capital improvement far which a credit is given is <br />part of the phasing of a larger project and that the credit received against the systems development <br />charge is greater than the charge far the phase where the capital improvement is constructed, credit <br />shall not be transferable from one development to another. <br />~7~ Credit shall not be transferable from one type of capital improvements to <br />another. <br />Section 3, The City Recorder, at the request of, or with the concurrence of the City Attorney, <br />is authorized to administratively correct any reference errors contained herein or in other rovisions <br />P <br />of the Eugene Code,1971, to the provisions added, amended or repealed herein. <br />Passed by the City Council this <br />Sth day of November, 1999 <br />•••- i <br />City Recorder <br />Approved by the Mayor this <br />8th day of November, 1999 <br />\ .~ <br />Mayo <br />Ordinance ~ Z <br />