Laserfiche WebLink
city did not use the % street design. However, engineering charges for the assessment are based on <br />actual staff time spent on the project. we do not support a modif cation to the proposed assessment <br />Mr. Kevin Hicks owner of tax lot 17-04-20-41-00100 purchased property in Blair Commons <br />Subdivision in January 1999. He stated there was no indication in his escrow documents that there <br />would be an assessment forthcoming when he purchased the property. City records indicate a notice <br />of potential assessment was posted on a on-line information source available to title companies for <br />this tax lot when the LID was formed in July of 199$. <br />Staff has discussed these concerns with the property owners and one person has requested to speak <br />at the hearing. <br />PROJECT DESCRIPTION <br />The project included street paving and construction of sidewalks, wastewater and stormwater <br />systems, street lights, and street trees. <br />ASSESSMENT <br />Costs are distributed per City Code 7.175, and as outlined in the Council adopted Hearings official <br />minutes, findings and recommendations and resolution forming the LID. Under City of Eugene <br />assessment policy, 60.5 percent of the improvement costs will be distributed to the abutting property <br />owners with the balance financed by the City. Below are the final unit assessable costs. <br />20' Paving $ 50.701 front foot <br />Sidewalks $ 14.511front foot <br />waste & Stormwater Pipe $ 21,085.751Lump Sum Tax Lot #17-04-20-14-00200} <br />Cost to City: $210,594.47 intersection, street lights, storm drain, over width paving}. <br />Costs listed below are the estimated assessment costs calculated from the low bid: <br />20' Paving $ 52.001front foot <br />Sidewalks $ 17.301front foot <br />wastewater Pipe $11,860.OOILump Sum (Tax Lot #17-04-20-14-00200} <br />Cost to City: $237,000.00 intersection, street lights, storm drain, over width paving}. <br />REC~MMENDATIUN <br />The final improvement costs are lower than those quoted at the local improvement hearing and are <br />comparable to prof ects of similar size. The cost for Tax Lot 17-04-20-14-00200 is higher due to <br />additional facilities provide to the parcel at the request of the property owners engineer. Staff <br />recommends approval of the assessment as calculated and that the Council levy the final <br />assessment. <br />Page 2 <br />