My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20183
COE
>
City of Eugene
>
Ordinances
>
1990s No. 19660-20183
>
Ordinance No. 20183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:49:40 PM
Creation date
1/14/2009 3:19:42 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
20183
Document_Title
Levying assessments for paving, curbs, gutters, sidewalks, wastewater, street lights, and street trees on Avalon Street from Terry Street to 2,700 feet west of Terry Street, and declaring an emergency. (Contract 98-17) (Job #3666)
Adopted_Date
12/6/1999
Approved Date
12/6/1999
CMO_Effective_Date
12/6/1999
Signer
James D. Torrey
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
city did not use the % street design. However, engineering charges for the assessment are based on <br />actual staff time spent on the project. we do not support a modif cation to the proposed assessment <br />Mr. Kevin Hicks owner of tax lot 17-04-20-41-00100 purchased property in Blair Commons <br />Subdivision in January 1999. He stated there was no indication in his escrow documents that there <br />would be an assessment forthcoming when he purchased the property. City records indicate a notice <br />of potential assessment was posted on a on-line information source available to title companies for <br />this tax lot when the LID was formed in July of 199$. <br />Staff has discussed these concerns with the property owners and one person has requested to speak <br />at the hearing. <br />PROJECT DESCRIPTION <br />The project included street paving and construction of sidewalks, wastewater and stormwater <br />systems, street lights, and street trees. <br />ASSESSMENT <br />Costs are distributed per City Code 7.175, and as outlined in the Council adopted Hearings official <br />minutes, findings and recommendations and resolution forming the LID. Under City of Eugene <br />assessment policy, 60.5 percent of the improvement costs will be distributed to the abutting property <br />owners with the balance financed by the City. Below are the final unit assessable costs. <br />20' Paving $ 50.701 front foot <br />Sidewalks $ 14.511front foot <br />waste & Stormwater Pipe $ 21,085.751Lump Sum Tax Lot #17-04-20-14-00200} <br />Cost to City: $210,594.47 intersection, street lights, storm drain, over width paving}. <br />Costs listed below are the estimated assessment costs calculated from the low bid: <br />20' Paving $ 52.001front foot <br />Sidewalks $ 17.301front foot <br />wastewater Pipe $11,860.OOILump Sum (Tax Lot #17-04-20-14-00200} <br />Cost to City: $237,000.00 intersection, street lights, storm drain, over width paving}. <br />REC~MMENDATIUN <br />The final improvement costs are lower than those quoted at the local improvement hearing and are <br />comparable to prof ects of similar size. The cost for Tax Lot 17-04-20-14-00200 is higher due to <br />additional facilities provide to the parcel at the request of the property owners engineer. Staff <br />recommends approval of the assessment as calculated and that the Council levy the final <br />assessment. <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.