Laserfiche WebLink
<br />ATTACHMENT A <br /> <br />River Avenue Proposed Improvement List as amended and <br />approved at the third River Avenue Stakeholder Group meeting <br />October 5, 2005: <br /> <br />A THREE (3) Lane road for continuous length of River Avenue with center <br />lane being A turn lane only fully improved with curb, gutters and storm <br />drainage. USE OF CURBS AND GUTTERS WILL BE CONSISTENT WITH, AND <br />SUPPORTIVE OF, BIOS WALE DESIGN WHERE POSSIBLE. <br /> <br />Setback sidewalks both sides (5 FT-WIDE') on west end of River Avenue up <br />to east end of Post Office. Curbside sidewalk (5 FT-WIDE) on north side <br />only from east end of Post Office to the east end of River A venue with no <br />sidewalk on south side of River Avenue EAST OF THE POST OFFICE. Flat <br />sidewalks to facilitate use of bioswales where possible. <br /> <br />Bike LANES on both sides up to east end of Post Office and connected to <br />bike path at west end of Wastewater Treatment Plant and then <br />CONNECTING TO A 12 FT. WIDE, MUL TI -USE, OFF-STREET PA TH on south <br />side only for continuous length of River Avenue. <br /> <br />STRIPED crosswalks (to control speed) at east end of Post Office, Ross Lane <br />and at the east end bike path across from the Orowheat store and possibly <br />at the VA building. <br /> <br />No landscaped islands or planters on any portion of the THREE (3) lane <br />road. Street trees to be planted at the west end only in the setback <br />sidewalk area up to the east end of the Post Office. EAST OF THE POST <br />OFFICE TREES WILL BE PLANTED ON THE SOUTH SIDE IN ACCORDANCE <br />WITH CITY POLICY. ON THE NORTH SIDE, EAST OF THE POST OFFICE, <br />TREES WILL BE PLANTED AT PROPERTY OWNERS' DISCRETION. <br /> <br />IN ADDITION, THE RIVER AVENUE STAKEHOLDER GROUP ALSO <br />RECOMMENDS THAT THE FOLLOWING WORK BE ADVANCED AND <br />IMPLEMENTED WITH THE RIVER A VENUE IMPROVEMENT PROJECT: <br /> <br />* OPERA TIONAL IMPROVEMENTS TO RIVER ROAD/RIVER A VENUE <br />INTERSECTION AS SUGGESTED BY CITY ENGINEERING STAFF; <br /> <br />* A SEPARATED BIKE/PED PA TH ON SOUTH SIDE OF RIVER A VE, <br />CONNECTING TO SANTA CLARA NEIGHBORHOOD BENEATH BELTLINE ON <br />THE EAST END OF PROJECT <br />