My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 19638
COE
>
City of Eugene
>
Ordinances
>
1980s No. 18550-19659
>
Ordinance No. 19638
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:45:56 PM
Creation date
2/4/2009 1:21:20 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
19638
Document_Title
An Ordinance levying assessments for sewer pump station on Walton Lane, 1300 feet north of Honeywood Street, to serve Sterling View Estates Phase II and contiguous property currently outside City limits in the City of Eugene, Lane County, Oregon.
Adopted_Date
9/25/1989
Approved Date
9/25/1989
CMO_Effective_Date
10/26/1989
Signer
Jeffrey R. Miller
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />FINDINGS AND RECOMMENDATIONS <br />PROJECT: SEWER PUMP STATION ON WALTO~T LANE, 130a FEET NORTH aF <br />HONEYWOOD STREET, TO SERE STERLING vIEW ESTATES PHASE <br />II AND CONTINGUOUS PROPERTY CURRENTLY OUTSIDE CITY <br />LIMITS ~ CONTRACT 88--08 ~ <br />BACKGROUND <br />This project was initiated by a petition from the developer for <br />an existing undeveloped subdivision. The properties petitioning <br />for the improvements will bear 27.4 percent of the improvement <br />costs. Since the initial petition five lots have been Bald, the <br />new property owners have been notified of the assessment hearing. <br />The developer will bear the cost of improvements for the other <br />properties within the subdivision. <br />Based on the petitions, the City Engineer initiated the project, <br />as provided for in the Eugene Code 7.10 ~ 8 ~ , on April Z5 , 1988 <br />Property owners were notified of the pending award hearing 10 <br />days prior to the hearing. The project was authorized for <br />construction by the City Council on June 27, 1988. The low bid <br />was submitted by EMK Contractor ; Inc . , for an amount of <br />$81,900.00. <br />PROJECT <br />The project includes sewer pump station and 2 1/2 cent levy <br />charges. <br />ASSESSMENT <br />Under City of Eugene assessment policy, most of the cost is <br />assessed to the abutting property owners, The costs. to be <br />assessed are shown below: <br />Pump Station $239.98 per lot <br />Levy charge (2 1/2¢> $150.01 per lot <br />Costs listed below are the Engineer's estimate and preliminary <br />costs quoted to the property owners at the award hearing <br />following bid opening, <br />Pump Station $550.00 per lot <br />Levy Charge (2 1/2¢> $195.00 per lot <br />~`INDING AND RECOMMENDATION <br />Costs are comparable to projects of similar size and are lower <br />than prelimiary costs quoted at the award hearing. Staff recom- <br />mends appropriation of the assessment distribution. <br />-~ 1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.