My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 19656
COE
>
City of Eugene
>
Ordinances
>
1980s No. 18550-19659
>
Ordinance No. 19656
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:46:02 PM
Creation date
2/5/2009 12:02:26 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
19656
Document_Title
An ordinance levying assessments for paving, curbs, gutters and sidewalks on Hickory Avenue from Garden Way to 140 feet west (south one-half of Hickory only).
Adopted_Date
12/4/1989
Approved Date
12/4/1989
CMO_Effective_Date
1/4/1990
Signer
Jeffrey R. Miller
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FJ(N~R~'T 'rR~f <br />FINDINGS AND RECOMMENDATIONS <br />SUBJECT; PAVING, CURBS, GUTTERS AND SIDEWALKS FOR HICKORY AVENUE <br />FROM GARDEN WAY TO 140 FEET WEST CONTRACT #8904} <br />BACKGROUND <br />This project was irritated by a petition of property owners, The <br />properties petitioning for the improvements will bear 100 percent <br />of the improvement costs . <br />Based on a 100 percent petition, the City Engineer initiated the <br />project as provided for in the Eugene Cade ?.160 ~ S~ , on December <br />28 , 19 8 8 . Property owners were notified of the pending award <br />hearing 10 days prior to the hearing. The project was authorized <br />for construction by the City Council on April 10, 1989. The low <br />bid was submitted by Dan D. Walt's Concrete Co., in an amount of <br />$9x723.55. <br />PROJECT <br />The project includes la foot paving, curbs, gutter and concrete <br />sidewalks. <br />ASSESSMENT <br />The total assessable cost is $14,332.68. Under City of Eugene <br />assessment policy, all of the cost is assessed to the abutting <br />property owners. The costs to be assessed are shown below: <br />10 foot paving $ 7G .43/front foot <br />4" sidewalk $ 2.87/sq, ft . <br />5" concrete driveway $ 3.25 sq.ft. <br />Costs listed below are the Engineer's estimate and preliminary <br />costs quoted to property owners at the award hearing following bid <br />opening . <br />10 foot paving $ 59.84/front foot <br />4" sidewalk $ 3.28/sq.ft. <br />5" concrete driveway $ 3.71/sq.ft. <br />FINDINGS AND RECOMNfEiVDATICNS <br />The final costs are lower than preliminary costs quoted at the <br />award hearing and are less than typical projects of this size. <br />Staff recommends appropriation of the assessment distribution. <br />--1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.