My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 1: FY10-15 Capital Improvement Program
COE
>
City of Eugene
>
Council Agendas 2009
>
CC Agenda - 02/17/09 Publlic Hearing
>
Item 1: FY10-15 Capital Improvement Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:15:59 PM
Creation date
2/13/2009 9:21:57 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
2/17/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />The Parks and Open Space program is anticipating about $11.2 million of improvements during the CIP <br />period. Several of the Parks and Open Space projects funded through System Development Charges <br />(SDC) have had their status changed from “Funding Secured” to “Funding Identified”, or had the SDC <br />portion of the project funding reduced, due to a projected shortfall in SDC revenues. <br /> <br />Several projects are also anticipated over the next six years in the Public Buildings and Facilities <br />category. The approximately $29.6 million of funded projects in this category are mainly for <br />preservation and maintenance of existing City facilities. This category also contains several placeholder <br />projects, including City Hall Replacement, Police Patrol Facility and Police Special Operations Facility. <br /> <br />$13.3 million of improvements to the Stormwater system are planned in this CIP. Several of the <br />Stormwater projects funded through SDC have had their status changed from “Funding Secured” to <br />“Funding Identified”, or had the SDC portion of the project funding reduced, due to a projected shortfall <br />in SDC revenues. <br /> <br />$69.4 million of anticipated spending on Transportation projects represents the largest portion of the <br />CIP. Large projects with funding secured or identified include the Pavement Preservation Program, <br />Delta Ponds Overpass, Elmira Road/Maple Street and Bertelsen Road upgrades to City standards. <br />Several of the Transportation projects funded through System Development Charges (SDC) have had <br />their status changed from “Funding Secured” to “Funding Identified”, or had the SDC portion of the <br />project funding reduced, due to a projected shortfall in SDC revenues. <br /> <br />The City’s Wastewater system is scheduled for almost $14.1 million of improvements in the next six <br />years, with most of the capital spending designated for wastewater system rehabilitation. Several of the <br />Wastewater projects funded through System Development Charges (SDC) have had their status changed <br />from “Funding Secured” to “Funding Identified”, or had the SDC portion of the project funding reduced, <br />due to a projected shortfall in SDC revenues. <br /> <br />Unfunded Projects <br />Also included in the CIP are projects totaling $103.7 million for which funding has not been identified. <br />The CIP also contains $213.9 million in placeholder projects for which funding has not been identified <br />and which are still in the decision process. <br /> <br />Transportation projects continue to reflect significant need for additional funding. The CIP includes <br />approximately $59 million of unfunded projects that would upgrade and enhance capacity and preserve <br />and maintain existing assets, as well as build new bike paths, collectors and other improvements. The <br />Public Buildings and Facility category contains approximately $31 million in unfunded projects. The <br />Parks and Open Space category has $13.6 million in unfunded projects. <br /> <br />CIP Development and Review <br />During the summer and early fall of even-numbered years, staff compiles the Draft CIP using input and <br />requests from a variety of sources, including neighborhood groups, individual citizens, adopted plans <br />and policies, etc. <br /> <br />The draft CIP document was made available on the City’s website in early December of 2008. On <br />December 12, 2008, information about the draft FY 2010-15 CIP, capital projects specific to particular <br /> Z:\CMO\2009 Council Agendas\M090217\S0902171.doc <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.