Laserfiche WebLink
<br />6. Add Table 16a following Table 16, as follows: <br /> <br />Table 16a <br />MWMC Wastewater Treatment and Collection System Improvements, Rough Cost <br />Estimate, and Timing Estimate <br /> <br />Project Project Name/Description Cost* Estimated <br />Number ($000,000) Completion Year <br />300WPCF Treatment Project$120.3 <br /> <br />300A Preliminary Treatment ($12.8) 2010 <br />300B Primary Treatment ($4.8) 2012 <br />300C Secondary Treatment ($24.7) 2017 <br />300D Disinfection/Outfall ($5.6) 2010 <br />300E Biosolids Treatment ($18.3) 2013 <br />300F Filtration ($20.2) 2020 <br />300G Reuse Facilities ($16.) 2018 <br />300H Odor Control ($6.9) 2012 <br />300I Flow Management Facilities ($11.) 2010 <br />301 Residuals Treatment Project $5.2 <br />301A Lagoon Rehabilitation ($4.5) 2012 <br />301B Composting Facility ($.7) 2017 <br />302 Beneficial Reuse Project $4.6 <br />302A Biocycle Farm ($0.6) 2008 <br />302B Effluent Reuse ($4.) 2017 <br />303 Willakenzie Pump Station $6. 2010 <br />304 Screw Pump Station $2. 2010 <br />305 Glenwood Pump Station $0.5 2012 <br /> TOTAL: $138.6 <br />*Cost estimated in 2004 dollars <br /> <br />7. Add a new chapter to the Public Facilities and Services Plan, to be Chapter VI., reading <br />as follows: <br /> <br /> <br /> <br /> <br /> <br />2.VI. Amendments to the Plan <br /> <br />This chapter describes the method to be used in the event it becomes necessary or appropriate to <br />modify the text, tables or the maps contained in the Public Facilities and Services Plan (“the <br />Plan”). <br /> <br />1.Flexibility of the Plan <br /> <br />Ordinance - 8 <br /> <br />