My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 5: PH on Ordinance Concerning Amendments to Public Facilities and Services Plan
COE
>
City of Eugene
>
Council Agendas 2006
>
CC Agenda - 01/09/06 Mtg
>
Item 5: PH on Ordinance Concerning Amendments to Public Facilities and Services Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:52:21 PM
Creation date
1/6/2006 3:10:40 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
1/9/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ATTACHMENT B <br />APPENDIX B <br />CHANGES TO THE PUBLIC FACILITIES AND SERVICES <br />PLAN (PFSP) <br /> <br /> <br /> <br />1.Modify the text preceding existing Table 3 to read as follows: <br /> <br />Planned Wastewater System Improvements <br /> <br />, . <br />Planned wastewater system improvement projects are listed in tables 3, 44a and 4b The <br />, <br />general location of these facilities is shown in Map 2: Planned Wastewater Facilities <br />[NOTE: This <br />and Map 2a: Existing Wastewater Collection and Treatment Systems. <br />map presently exists as Map 6 in the Technical Background Report: Existing <br />Conditions and Alternatives and should be incorporated without change.] <br /> <br /> <br />2.Insert, following Table 4, Tables 4a and 4b, as follows: <br /> <br />Table 4a <br />MWMC Wastewater Treatment System Improvement Projects <br />PROJECT NAME PROJECT DESCRIPTION <br />PROJECT # <br />300 WPCF Treatment Includes several construction packages <br />Project designed to manage and treat wastewater at <br />the WPCF to the year 2025. <br />300A Preliminary Treatment Increase preliminary treatment capacity of <br />headworks to meet anticipated 2025 peak <br />wet weather flows <br />300B Primary Treatment Enhance existing primary clarifiers and add <br />primary sludge thickening facilities to <br />increase primary treatment capacity to meet <br />anticipated peak wet weather flows <br />300C Secondary Treatment Convert aeration basins, enhance existing <br />secondary clarifiers, and add secondary <br />clarifiers to increase secondary treatment <br />capacity to meet anticipated peak wet <br />weather flows <br />300D Disinfection/Outfall Convert disinfection system, and increase <br />bankside outfall capacity <br />300E Biosolids Treatment Increase digestion capacity by enhancing <br />existing digesters and sludge thickening <br />capacity and/or adding a digester <br />300F Filtration Add filtration and build related <br />infrastructure and support facilities <br />300G Reuse Facilities Expand effluent reuse capacity <br />300H Odor Control Expand and/or add odor control facilities <br />300I Flow Management Piping, pumping and related infrastructure <br />Facilities improvements to allow parallel operation <br />Appendix B Page 1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.