Laserfiche WebLink
collection system will be necessary to meet demands of growth over this time <br />period. <br /> <br />2. Based on 2003 analysis, the Eugene-Springfield metropolitan area treatment <br />facilities will require facility improvements to address both dry and wet weather <br />regulatory requirements relating to pollutant loads and wastewater flows. <br />Regional and local wastewater improvements to the collection and treatment <br />systems are being planned for and will be implemented to allow for growth within <br />the UGB and for regulatory compliance. <br /> <br />6. Add Table 16a following Table 16, as follows: <br /> <br />Table 16a <br />MWMC Wastewater Treatment and Collection System Improvements, Rough Cost <br />Estimate, and Timing Estimate <br /> <br />Project Project Name/Description Cost* Estimated <br />Number ($000,000) Completion Year <br />300WPCF Treatment Project$120.3 <br /> <br />300A Preliminary Treatment $12.8 2010 <br />300B Primary Treatment $4.8 2012 <br />300C Secondary Treatment $24.7 2017 <br />300D Disinfection/Outfall $5.6 2010 <br />300E Biosolids Treatment $18.3 2013 <br />300F Filtration $20.2 2020 <br />300G Reuse Facilities $16. 2018 <br />300H Odor Control $6.9 2012 <br />300I Flow Management Facilities $11. 2010 <br />301 Residuals Treatment Project $5.2 <br />301A Lagoon Rehabilitation $4.5 2012 <br />301B Composting Facility $.7 2017 <br />302 Beneficial Reuse Project $4.6 <br />302A Biocycle Farm $0.6 2008 <br />302B Effluent Reuse $4. 2017 <br />303 Willakenzie Pump Station $6. 2010 <br />304 Screw Pump Station $2. 2010 <br />305 Glenwood Pump Station $0.5 2012 <br />*Cost estimated in 2004 dollars <br /> <br />7. Add a new chapter to the Public Facilities and Services Plan, to be Chapter <br />VI., reading as follows: <br /> <br />VI. Amendments to the Plan <br /> <br />Appendix B Page 5 <br /> <br />