Laserfiche WebLink
300H Odor Control Expand and/or add odor control <br />facilities <br />300I Flow Management Piping, pumping and related <br />Facilities infrastructure improvements to allow <br />parallel operation of primary and <br />secondary treatment facilities <br />301 Residuals Treatment Includes several construction <br />Project packages designed to manage and <br />treat residuals. <br />301A Lagoon Rehabilitation Rehabilitate lagoons at Biosolids <br />Management Facility <br />301B Composting Facility Expand composting facility at Biosolids <br />Management Facility <br />302 Beneficial Reuse Project Includes several construction <br />packages designed to expand reuse of <br />effluent. <br />302A Biocycle Farm Expand biosolids land application area <br />302B Effluent Reuse Expand effluent reuse at Biocycle Farm <br />(including former Seasonal Industrial <br />Waste site) <br /> <br /> <br />Table 4b <br />MWMC Primary Collection System Improvement Projects <br /> <br />Project Project Name/Description <br />Number <br />303 Willakenzie Pump Station <br />304 Screw Pump Station <br />305 Glenwood Pump Station <br /> <br /> <br /> <br />3.Modify Map 2 to show Projects 300 through 305, and insert Map 2a. <br />Appendix B Page 5 <br /> <br />