My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A-MWMC Facilities Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/19/04WS
>
Item A-MWMC Facilities Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:11:10 PM
Creation date
5/12/2004 3:16:01 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/19/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MWMC FACILITIES PLAN <br /> <br />The WPCF maintenance facilities consist of the maintenance shop, welding shop, steam <br />cleaning bay, stores area, and field maintenance shop. The maintenance shop, welding shop, <br />and steam room comprise approximately 11,770 square feet, stores occupies 2,290 square <br />feet, and the facility maintenance shop comprises approximately 2,000 square feet. <br /> <br />3.2.4 Unit Performance and Deficiencies <br />Unit processes at both the WPCF and the BMF have been evaluated for capacity and <br />performance so that current and future needs can be addressed without a lapse in treatment <br />capability. Table 3.2.4-1 summarize the liquids unit processes, process limitations, and <br />process deficiencies identified through the analysis. Table 3.2.4-2 summarize the solids unit <br />processes, process limitations, and process deficiencies. <br /> <br /> 3-16 MWMC_3.0_REV11.DOC <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.