My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A-MWMC Facilities Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/19/04WS
>
Item A-MWMC Facilities Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:11:10 PM
Creation date
5/12/2004 3:16:01 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/19/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTENTS, CONTINUED <br /> <br />5.1.3-3 Dry Weather Maximum Week Effluent Concentration Requirements Based on <br /> Existing Mass Load Limitations and Projected Flows <br />5.1.3-4 Wet Weather Maximum Week Effluent Concentration Requirements Based on <br /> Existing Mass Load Limitations and Projected Flows <br />5.1.3-5 Dry Season Peak Week Excess Thermal Load Based on Existing Thermal Load <br /> Limitations and Projected Flows <br />6.1.2-1 Selected Alternative Elements <br />6.1.2-2 MWMC Wet Weather Flow Management Plan (WWFMP) 10-Year Implementation <br /> Schedule <br />6.2.1-1 WPCF Anoxic, Step-Feed Plug-Flow Process <br />6.2.6-1 CBOD and TSS Operating Performance <br />6.2.6-2 Filtration Required at Worst Case Maximum Month Wet Weather Flow <br />6.5.2-1 Digester Phasing <br />6.5.3-1 Facultative Sludge Lagoon Phasing <br />6.5.3-2 Facultative Sludge Lagoon Solids Inventory <br />6.6.2-1 Process Flow Schematic for System Alternative 3-- Additional Primary Clarifiers <br />6.6.2-2 Process Flow Schematic for System Alternative 4-HRC <br />6.6.2-3 Process Flow Diagram for System Alternative 5- Parallel Primary and Secondary <br /> 'Treatment <br />6.6.3-1 Site Layout of System Alternative 2 Additional Primary and Secondary Clarifiers, <br /> Aeration Basin <br />6.6.3-2 Site Layout of System Alternative 3 Additional Primary Clarifiers <br />6.6.3-3 Site Layout of System Alternative 4 High-Rate Clarification <br />6.6.3-4 Site Layout of System Alternative 5 Parallel Primary and Secondary Clarifiers <br />6.6.4-1 Cost and Weekly TSS Loading <br />6.6.4-2 Cost and Weekly CBOD5 Loading <br />7.2.1-1 Recommended Aeration Basin Modifications to Step-Feed, Plug-Flow Activated <br /> Sludge with Selectors <br />7.2.2-1 Secondary Clarifier Enhancements <br />7.2.3-1 Recommended Primary Clarifier Enhancements <br />7.2.6-1 Proposed Effluent Stream Disinfection Operation <br />7.4.1-1 Recommended Process Flow Diagram for Peek Flow Management - Parallel <br /> Primary and Secondary Treatment <br />7.4.1-2 Site Layout of Recommended System Solution Parallel Primary/Secondary <br /> Treatment <br />7.4.2-1 General 2025 Liquids Process Flow Diagram and Liquids Balance <br />7.4.2-2 General 2025 Solids Balance <br />7.7-1 Alternative 5 Project Phasing Diagram <br />7.7-2 Alternative 4 Project Phasing Diagram <br />9.4.1-1 Proposed Layout for System Alternative 1-Parallel Primary and Secondary <br /> Treatment <br />9.5.1-1 Proposed Layout for System Alternative 2--High-Rate Clarification <br /> <br />VIII MWMC_CONTENTS_REVS.DOC <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.