My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A-MWMC Facilities Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/19/04WS
>
Item A-MWMC Facilities Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:11:10 PM
Creation date
5/12/2004 3:16:01 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/19/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MWMC FACILmES PLAN <br /> <br />TABLE 5.4.4-1 <br />Seasonal Land Application 2025 Design Criteria <br />MWMC Facilities Plan, Eugene-Springfield <br /> <br /> Unit Process Existing Criteria/Conditions Year 2025 <br />Site Loading Criteria <br /> Nitrogen Loading <br /> Poplar Trees (liquid biosolids) 220 lbs N/acre 220 lbs N/acre <br /> Grass (dewatered biosolids) 120 lbs N/acre 120 lbs N/acre <br /> Biosolids Loading <br /> Poplar Trees (liquid biosolids) 3.4 dry tons/acre 5.4 dry tons/acre <br /> Grass (dewatered biosolids) 4.2 dry tons/acre 4.2 dry tons/acre <br /> <br /> SITE CHARACTERISTICS <br /> Available Land, total 7500 acres Unknown <br /> Dewatered Biosolids Capacity, total 31,200 dry tons/year Unknown <br /> <br /> MWMC_5.0_REVB_VKS.DOC <br /> 5-3O <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.