My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A-MWMC Facilities Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/19/04WS
>
Item A-MWMC Facilities Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:11:10 PM
Creation date
5/12/2004 3:16:01 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/19/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. DEVELOPMENT AND EVALUATION OF ALTERNATIVES <br /> <br />It would be financially beneficial to investigate adding the SIWF to the WPCF's NPDES <br />permit to decrease annual permit costs. The cost-benefit analysis for this alternative is <br />presented in Table 6,5.5-1. <br /> <br />Alternative 2 - Sell the SIWF <br />Alternative 2 is to decommission and sell the land. Advantages and disadvantages of this <br />alternative are listed below. <br /> <br />Advantages: <br /> Selling the SIWF would avoid the capital costs associated with the infrastructure on site <br /> Eliminates annual O&M costs <br /> Would eliminate future site liability <br /> Revenue could fund other costs <br /> <br />Disadvantages: <br /> Lose a potentially valuable asset (land and existing facilities) related to the overall long- <br /> term strategies of MWMC's biosolids and effluent reuse program, as well as to potential <br /> regulatory changes. <br /> <br /> To receive the highest possible value for the site, decommissioning efforts will be <br /> required. This is based on selling the land as it is currently zoned (E-30, exclusive farm <br /> use). <br /> <br />* Availability and proximity of land, if required in the future, may be scarce commodities. <br /> <br />· Future cost for development of a site similar to the SIWF will be great. <br /> <br />Alternative 3 -Convert the 14-acre Lagoon at the SIWF into a new Facultative Sludge Lagoon <br />Alternative 3 consists of upgrading the SIWF lagoon to a new FSL. Under this alternative, <br />liquid biosolids could be applied on site. It is also assumed that biosolids, if applied at the <br />SIWF, would be applied on grass crops at the SIWF and that the existing land lease <br />agreement would remain in place. The SIWF lagoon would become the fifth FSL. <br />Advantages and disadvantages of this alternative are listed below. <br /> <br />Advantages: <br />· Provides additional sludge stabilization and solids storage, which may be needed in the <br /> future <br /> <br />· Continued leasing of the land for local farming activity ensure that the site is <br /> continuously farmed using sound farm management practices <br /> <br />· Maintains flexibility in MWMC's biosolids management program <br /> <br />Disadvantages: <br />· The FSL would be remote from the other four FSLs located at the BMF <br /> <br />· Piping intercormections and pumping facilities would need to be installed between the <br /> SIWF and BMF <br /> <br />· Potential for increased complexity of control strategies <br /> <br />· O&M is remote from the BMF facilities <br /> <br />MWMC_6.0_REVI1.DOC 6-47 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.