My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A-MWMC Facilities Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/19/04WS
>
Item A-MWMC Facilities Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:11:10 PM
Creation date
5/12/2004 3:16:01 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/19/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. DEVELOPMENT AND EVALUATION OF ALTERNATIVES <br /> <br /> ~ 30 mgd through Tertiary <br /> Filtration <br /> <br /> 300 mgd through ~ 160 mgd through <br /> Primary Clarification Secondary Treatment <br /> <br /> ~140 mgd through "Blending" <br /> Diversion <br /> <br />FIGURE 6,6.2-1 <br />Process Flow Schematic for System Alternative 3--Additional Primary Cladfiers <br />MWMC Facilities Plan, Eugene-Springfield <br /> <br />System Alternative 4 - High-Rate Clarification <br />A new high-rate clarification (HRC) trait process would be constructed and used in <br />conjunction with the existing primary clarifiers to treat the entire 277 mgd PWWF A ptunp <br />station would divert pretreated effluent in excess of 160 mgd from preliminary treatment to <br />the new HRC facility. Primary effluent from the HRC facility would be diverted around the <br />secondary treatment system via gravity. The HRC primary and secondary effluents would <br />be disinfected separately and blended prior to discharge into the river. Figure 6.6.2-2 shows <br />the process flow schematic for system alternative 4. <br /> <br /> ~ 30 mgd through Tertiary <br /> Filtration <br /> <br /> ~ 160 mgd through <br /> Primary / Secondary <br /> <br /> ~ 140 mgd through High <br /> Rate Clarification <br /> <br />FIGURE 6.6.2-2 <br />Process Flow Schematic for System Alternative 4--HRC <br />MWMC Facilities Plan, Eugene-Springfield <br /> <br />System Alternative 5 - Parallel Primary and Secondary Treatment <br />During peak flow events a dynamic flow management strategy would be used to optimize <br />the existing primary and secondary treatment capacities. Two new pump stations would be <br />used to divert preliminary treated wastewater directly to secondary treatment and divert PE <br />arottnd secondary treatment. Pretreated effluent would flow to the existing primary <br /> <br />MWMC_6.0_REV11 .DOC 6-53 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.