My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A-MWMC Facilities Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/19/04WS
>
Item A-MWMC Facilities Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:11:10 PM
Creation date
5/12/2004 3:16:01 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/19/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7, RECOMMENDED PLAN <br /> <br />TABLE 7.5-1 <br />Summary of Recommended Improvements through Year 2025 <br />MWMC Facilities Plan, Eugene-Springfield <br /> <br /> Unit Process Improvements <br />Influent Pump Station · Install one additional screw pump. <br />Screening ,, Install four new fine screens. <br /> · Install two new screenings washer/compactors. <br /> · Install four new Parshall flumes for flow measurement. <br />Grit Removal · Install four new vortex grit separators. <br /> · Install four new grit pumps and cyclones. <br /> · Install two new grit classifiers. <br /> · Install two new screenings/grit hoppers. <br /> <br />Parallel Primary and · Construct new Preliminary Treatment Diversion Pump Station with four <br />Secondary Treatment new preliminary treatment diversion pumps. <br /> <br /> · Construct new Primary Treatment Diversion Pump Station with four new <br /> primary treatment diversion pumps. <br /> <br /> · Install piping to enable primary and secondary treatment to be operated in <br /> parallel. <br /> <br />Primary Clarifiers · Install a new feed well. <br /> · Install new EDIs for increased energy dissipation from feed well. <br /> · Install new density current baffles at outboard launders. <br /> <br /> · Operate primary clarifiers without a sludge blanket by pumping a thin <br /> primary sludge at a high flow rate from the primary clarifiers to an external <br /> thickener. <br /> <br /> · Install two new 50-foot gravity thickeners. <br /> · Construct new thickened primary sludge pump station. <br />Gravity Belt Thickeners . Install one new gravity belt thickener. <br />Aeration Basins · Install new step feed equipment and piping. <br /> · Install new anoxic selectors. <br /> · Install new fine bubble diffusers. <br /> · Remove effluent gates. <br /> · Install new primary effluent flow control gates. <br /> <br />MWMC_7.0_REV4.DOC 7-! ! <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.