My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A-MWMC Facilities Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/19/04WS
>
Item A-MWMC Facilities Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:11:10 PM
Creation date
5/12/2004 3:16:01 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/19/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 7.2.1-1 <br />Liquid Processes Design Criteria, Existing and 2025 Capacity Needs <br />MWMC Facilities Plan, Eugene-Springfield <br /> <br /> Unit Process Existing Criteria/Conditions Year 2025 <br /> <br />HRT @ OwwPH 5 rain 6.25 min <br />Volume, each/Total 152,000 gal / 608,000 gal 152,000 gal / 608,000 gal <br />Length x Width 130-ft 2-in x 13-ft 130-ft 2-in x 13-ft <br />Capacity, each//Total @ QDWA 14.6 mgd/58.4 mgd 9.6 mgd/38.4 mgd <br />PRIMARY CLARIFICATION <br />Primary Clarifiers <br />Design Criteria SOR = 1,250 gpd/ft2 @ 71.5 <br /> mgd <br />Diameter 135 fl 135 ft <br />Side Water Depth 12 ft 12 ft <br />Number of Units 4 4 <br />Actual SOR @ QWWPH all units in service 3,056 gpd/ft2 2,794 gpd/ft2 <br />Actual SOR @ QWWMM w/1 unil out of service NA 1,935 gpd/ft2 <br />Actual SOR @ QwwA all units in service 1223 gpd/ft2 1,191 gpd/ft2 <br />Actual SOR @ QDWMM all units in service NA 1,036 gpd/ft2 <br />Actual SOR @ QDWA all units in service 856 gpd/ft2 671 gpd/ft2 <br />TSS Removal % @ QWWPH 0 % 40% <br />TSS Removal % @ QwwA 50% 50% <br />TSS Removal % @ QDWA 50% 50% <br />Primary Treatment Diversion Pumps <br />Number of units NA 4 <br />Capacity, each/total NA 50 mgd/200 mgd <br />Type NA Vertical Turbine <br /> <br />SECONDARY TREATMENT <br /> <br />Step Feed With Anoxic Selector Process Parameters <br />SRT in July through Sept., days 5 days until 2010; 6 days from <br /> 2010 to buildout <br />DO, mg/L 2 <br />Dry Season Temperature in Biological Process, 20 <br />°C <br />Wet Season Temperature in Biological 12 <br />Process, °C <br />Dry Season Max Month MLSS, mg/L 3,200 <br />Wet Season Max Month MLSS, mg/L 2,200 <br />Period for Complete Nitrification July - September July - September <br />Aeration Basins <br /> <br />Number of Basins 2 (8 cells) 2 Step Feed Basins <br /> (4 cells per train) <br />Volume, Each/Total 2 Mgal/16 Mgal 9.5 Mgal/19 Mgal <br />Sidewater Depth 15 ft 17 ft <br />Number of Aerobic Zones 8 4 cells per basin <br />Number of Anoxic Zones NA 4 cells per basin <br /> <br /> MWMC_TABLE 72.1A_REV7.DOC 3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.