Laserfiche WebLink
TABLE ?.3,1-1 <br />Seasonal Land Application Design Criteria - Existing and 2025 Capacity Needs <br />MWMC Facilities Plan, Eugene-Springfield <br /> <br /> Unit Process Existing Criteria/Conditions Year 2025 <br /> Type <br /> <br />SITE CHARACTERISTICS <br />Available Land, total 7500 Unknown <br />Dewatered Biosolids Capacity, total 31,200 dry tons/year Unknown <br /> <br /> MWMC_TABLE 7.3.1-1 REV4.DOC 2 <br /> <br /> <br />