My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A-MWMC Facilities Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/19/04WS
>
Item A-MWMC Facilities Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:11:10 PM
Creation date
5/12/2004 3:16:01 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/19/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name: Repaidpartial replacement of biosolids forcemain <br /> <br />Description: Repair/replace sections of the biosolids forcemain where struvite deposits <br /> limit pipe diameter and cannot be removed by acid wash. <br /> <br />Justification: <br />Project Driver: <br />Project Trigger: <br />Type of Project 100% Rehabilitation <br /> <br />Estimated Project Cost $1,000,000 <br />(2004 Dollars): <br /> <br />Phasing: Budgeted for FY2011/12 <br /> <br />Project Name: Permanent Level IV Reuse <br /> <br />Description: Provide 2.5 mgd of permanent Level IV reuse water to local greenspaces <br /> and community areas. Modify/install UV system capable of 3 mgd and <br /> modify/increase piping system installed in demonstration project. Total <br /> reuse of 5.25 mgd. <br /> <br />Justification: <br />Project Driver: <br />Project Trigger: <br />Type of Project 100% Performance <br /> <br />Estimated Project Cost $4,100,000 <br />(2004 Dollars): <br /> <br />Phasing: Budgeted for FY2012/13 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.