Laserfiche WebLink
Project Name: North Aeration Basin Improvements <br /> <br />Description: Add step-feed, anoxic selectors, and assume existing diffusers will be <br /> replaced in 15 years, main air header will not be replaced <br /> <br />Justification: <br />Project Driver: <br />Project Trigger: <br />Type of Project 50% Capacity; 50% Performance <br /> <br />Estimated Project Cost $6,200,000 <br />(2004 Dollars): <br /> <br />Phasing: Budgeted for FY2015/16 <br /> <br />Project Name: Level IV Reuse - Full Scale Operation <br /> <br />Description: Provide 2.5 to 5.0 mgd of Level IV reuse. Increase pumping capacity, <br /> reuse pipeline, and UV system. Total reuse capacity of 7.75 to 10.25 mgd. <br /> <br />Justification: <br />Project Driver: <br />Project Trigger: <br />Type of Project 100% Pedormance <br /> <br />Estimated Project Cost $9,800,000 <br />(2004 Dollars): <br /> <br />Phasing: Budgeted for FY2015/16 <br /> <br /> <br />