My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A-MWMC Facilities Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/19/04WS
>
Item A-MWMC Facilities Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:11:10 PM
Creation date
5/12/2004 3:16:01 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/19/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MWMC FACILITIES PLAN <br /> <br />Project Type Allocation <br />These improvements, which are driven by increased community performance standards, <br />provide capacity/enhanced capability for both the growth increment and for existing users <br />and are therefore allocated entirely to Performance. <br /> <br />Aeration Basin Modifications - South and North <br />Facility Component Allocation <br />The primary purpose of these modifications is to improve the capacity of the aeration basins <br />and the performance of the overall secondary treatment system. A secondary benefit of <br />these projects is to provide the WPCF with additional operational flexibility during peak <br />flow events. These projects are allocated 90 percent to Secondary Treatment and 10 percent <br />to Peak Flow Management. <br /> <br />Project Type Allocation <br />These projects expand capacity as well as improve the performance of the secondary <br />treatment system to meet the new ammonia limit and more effectively and consistently <br />meet the BOD and TSS limits moving forward. These projects are equally divided between <br />Capacity and Performance. <br /> <br />Secondary Clarifier Enhancements <br />Facility Component Allocation <br />This project is allocated equally between Secondary Treatment and Peak Flow Management <br />because both the base capacity of the secondary treatment process as well as the peak flow <br />capacity of the facility are increased as a result of these improvements. <br /> <br />Project Type Allocation <br />This project is split equally between Capacity and Performance because the modifications to <br />these existing units increases the liquids treatment capacity of the facility and also improves <br />the consistency/reliability of the effluent performance. <br /> <br />9th and 10th Secondary Clarifiers <br />Facility Component Allocation <br />Construction of these two additional units increases the base capacity of the secondary <br />treatment system and the peak flow capacity of the overall facility and therefore the <br />allocation is split equally between Secondary Treatment and Peak Flow Management. <br /> <br />Project Type Allocation <br />This project expands capacity and is allocated entirely to Capacity. <br /> <br />Conversion to Sodium Hypochlorite Disinfection <br />Facility Component Allocation <br />Approximately half of the cost of this project will provide the facilities to convert <br />disinfection from chlorine to sodium hypochlorite for the base secondary effluent flow. The <br />remaining half of the costs of this project are for providing disinfection to the high-rate <br />clarification effluent in the case of peak flow management Alternative 4, or to the primary <br />effluent in the case of peak flow management Alternative 5. Therefore, 50 percent is <br />allocated to Disinfection/Ouffall and 50 percent to Peak Flow Management. <br /> <br />8-10 MWMC_8.0_REVS, DOC <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.